2-21
CABLE ROUTING DIAGRAM
E.
Fasten the neutral switch lead,
CDI magneto lead, radiator
breather hose and clutch cable
over the radiator mounting boss.
F.
Pass the radiator breather hose
in front of the radiator, on the left
of the chassis, and then be-
tween the frame and radiator
hose 4.
G. Fasten the sub-wire harness
and engine stop switch lead to
the CDI unit bracket at the white-
taped portion of the subwire har-
ness and with the clamp ends
facing downward.
H.
Locate the clamp ends in the ar-
rowed range.
I.
Fasten the neutral switch lead
and CDI magneto lead over the
hump of the frame.
J.
Fasten the hot starter cable and
throttle cable onto the frame.
K.
Fasten the throttle position sen-
sor lead and the hot starter ca-
ble.
L.
Locate the clamp between the
hot starter cable protector and
rubber cap.
M. Locate the clamp ends under
the throttle cable, and after
clamping, leave the other end as
is and do not cut it. [clamp:L=
270mm (10.6 in)]