2-15
CABLE ROUTING DIAGRAM
D.
Pass the CDI magneto lead and
radiator breather hose between
the frame and the radiator(right).
E.
Clamp the CDI magneto lead to
the frame at its locating tape.
F.
Bring the connector cover into
contact with the coupler.
G. Locate the clamp ends in the ar-
rowed range.
H.
Insert the CDI unit band until it
stops at the CDI unit stay.
I.
Pass the CDI magneto lead and
radiator breather hose between
the frame and the radiator hose
so that they come within the ar-
row-indicated range. Also take
care so that the CDI magneto
lead passes on the left of the ra-
diator breather hose.
Summary of Contents for YZ125X1
Page 2: ...1C3 9 33_cover 07 6 14 9 59 AM Page 2...
Page 3: ...YZ125 X X1 1C3 28199 33 E0 2008 OWNER S SERVICE MANUAL...
Page 4: ......
Page 87: ...4 32 WATER PUMP...
Page 131: ...5 30 STEERING 9 Bearing race 2 Refer to removal section Order Part name Q ty Remarks...
Page 159: ......