–7–
YFM660F(P) 2002
SET-UP AND PREDELIVERY CHECKLIST
NOTE:
Check the following items again when set up and predelivery service are completed.
A: INSTALLATION OF THE PARTS INCLUDED IN THE CRATE
Handlebar
Front brake master cylinder
Throttle housing
Rear brake cable
Rear brake light switch
Horn switch (for Europe and Oceania)
Handlebar switch
Handlebar bands
Handlebar cover
Front shock absorbers
Protectors (front arms)
Rear shock absorbers
Protectors (rear arms)
Front wheels
Rear wheels
Engine skid plates
Fuel tank side panels
Battery
Owner’s manual
Seat
Front reflectors (for CDN)
Rear reflectors (for CDN)
B: TIGHTENING TORQUE OF EACH PART
Steering stem and handlebar holder
20Nm (2.0 m•kg, 14 ft•lb)
Master cylinder and handlebar
7Nm (0.7 m•kg, 5.1 ft•lb)
Front shock absorber and front arm (lower)
45 Nm (4.5 m•kg, 32 ft•lb)
Rear shock absorber and frame
45 Nm (4.5 m•kg, 32 ft•lb)
Rear shock absorber and rear arm (lower)
45 Nm (4.5 m•kg, 32 ft•lb)
Front wheel and wheel hub
55Nm (5.5 m•kg, 40 ft•lb)
Rear wheel and wheel hub
55Nm (5.5 m•kg, 40 ft•lb)
Engine skid plate and frame
7Nm (0.7 m•kg, 5.1 ft•lb)
Battery bracket and frame
7Nm (0.7 m•kg, 5.1 ft•lb)
C: ROUTING OF WIRE, CABLES, ETC.
Front brake hose
Throttle cable
Rear brake cable
Rear brake light switch lead
Horn switch lead (for Europe and Oceania)
Starter cable
Handlebar switch lead
Band
Battery
Battery negative lead
Battery positive lead