
c. Hold bearing housing and check
preload. This preload is determined
by turning the shaft with a torque
wrench and measuring the resistance
of the bearings to the rotation of
the shaft.
CAUTION:
Do not hold the bearing housing in
a vise.
Preload Specification:
4
~
5 cm-kg (3.4 - 4.3 in-lb)
Nut tightening torque (for reference):
10~15m-kg (72 - 108ft-lb)
d. Repeat steps (a), (b) and (c) until
proper preload is reached.
NOTE:
Early type 1 units used a slightly
greater preload, however, use the
above specification for all types,
(9) Apply tooth pattern checking paint to
drive pinion gear. Check pattern and
adjust if necessary. Use procedure for
checking drive pinion.
(10) Install driven pinion assembly into
middle gear case as shown. Clean
bearing housing screws and apply
thread sealant. Tighten to specified
torque.
Driven Pinion Bearing Housing Screw
Torque: 2.5 m-kg (18 ft-lb)
Summary of Contents for XS750
Page 1: ......
Page 10: ...Componentsshould be room temperature 500 600 ...
Page 12: ......
Page 20: ...Intake i I CLEARANCE Exhaust ...
Page 93: ...XS750 Power Flow Schematic ...
Page 133: ......
Page 134: ......
Page 136: ......
Page 138: ...OIL SCAVENGE Return ...
Page 142: ......
Page 154: ......