FOR YOUR SAFETY – PRE-OPERATION CHECKS
5-3
Chassis fasteners
• Make sure that all nuts, bolts and screws are properly tightened.
• Tighten if necessary.
—
Instruments, lights, signals
and switches
• Check operation.
• Correct if necessary.
—
Sidestand switch
• Check operation of ignition circuit cut-off system.
• If system is not working correctly, have Yamaha dealer check vehicle.
ITEM
CHECKS
PAGE
U20S20E0.book Page 3 Wednesday, October 15, 2008 2:05 PM
ProCarManuals.com