5-25
POWR
E
CYLINDERS
CYLINDERS
EXPLODED DIAGRAM
REMOVAL AND INSTALLATION CHART
Step
Procedure/Part name
Q’ty
Service points
CYLINDER REMOVAL
Follow the left “Step” for removal.
YPVS
Refer to “YPVS”.
Cylinder head
Refer to “CYLINDER HEAD”.
1
Bolt
12
2
Cylinder
3
3
Cylinder gasket
3
4
Pin
6
Reverse the removal steps for installation.
NOTE:
Tighten the bolts in a crisscross pattern
and in two stages.
NOTE:
Install the original position.
Not reusable