EMU00174
Chapter 3
OPERATION
INSTALLATION
.......................................3-1
Mounting the outboard motor................3-2
BREAKING IN (RUNNING IN)
ENGINE
...................................................3-5
PRE-OPERATION CHECKS
...................3-6
Operation after a long period of
storage..................................................3-8
FILLING FUEL AND ENGINE OIL
..........3-9
Filling fuel..............................................3-9
Filling oil..............................................3-10
STARTING ENGINE
..............................3-13
WARMING UP ENGINE
........................3-16
SHIFTING
..............................................3-17
Forward...............................................3-17
Reverse...............................................3-17
STOPPING ENGINE
.............................3-18
TRIMMING OUTBOARD MOTOR
.........3-19
Adjusting trim angle ............................3-20
TILTING UP/DOWN
...............................3-22
CRUISING IN OTHER CONDITIONS
...3-25
Cruising in salt water ..........................3-25
Cruising in turbid water .......................3-25
E
1
2
3
4
5
6
60V-9-13-3 7/28/03 5:36 PM Page 1
Summary of Contents for VZ225C
Page 1: ...VZ225C Z250C LZ250C VZ250C OWNER S MANUAL U S A Edition LIT 18626 05 68...
Page 12: ...E 1 7 CAUTION LABELS 4...
Page 22: ...E MEMO...
Page 48: ...E MEMO...
Page 104: ...MEMO E...
Page 113: ...EMU00450 Chapter 6 INDEX INDEX 6 1 E 1 2 3 4 5 6...
Page 124: ...PLACE POSTAGE HERE ATTN WARRANTY DEPARTMENT Warranty card 2 27 02 11 47 AM Page 2...