14 - B - V
2 - 34
SPEC
‰
Fasten the clutch cable with the
paint in the cable guide bottom
recess.
Ï
Pass the throttle cable and
starter cable through the cable
guide.
Ì
Fasten the starter motor lead.
Ó
Pass the engine oil breather
hose and overflow hose
between the right half of the
swingarm and frame.
È
Pass the negative battery lead
on the inside of the frame as
shown.
Ô
Fasten the engine oil breather
hose, overflow hose and air
vent hoses to 2 clicks.
After fastening the starter cable,
push it against the starter
plunger.
Ò
Put the tip of the air vent hose
into the frame.
˜
Install the primary coil terminal
(orange) to the ignition coil.
ˆ
Fasten the ground lead together
with the ignition coil.
#!",%2/54).'$)!'2!-
Pass the overflow hose
between the right half of the
swingarm and frame.
Fasten the overflow hose and
air vent hoses to 2 clicks.
K
After fastening the star ter
cable, push it against the
starter plunger.
L
Put the tip of the air vent hose
into the frame.
Summary of Contents for TT-R125
Page 1: ...TT R125 W TT R125E W TT R125LW W TT R125LWE W LEW 1B2 F8199 82 ...
Page 49: ...GEN INFO MEMO ...
Page 185: ...INSP ADJ MEMO ...
Page 577: ... ELEC MEMO ...
Page 591: ... ELEC MEMO ...
Page 611: ... ELEC MEMO ...
Page 614: ......
Page 615: ......
Page 616: ...PRINTED IN BRAZIL E F G 05 2005 910 GYL 04 2006 1000 GYL ...