Perio
d
ic maintenance an
d
a
d
justment
6-8
6
To install the cowling
1. Place the cowling in the original
position, and then install the bolts
and the quick fasteners.
2. Install cowling A.
Cowlin
g
C
To remove the cowling
Remove the bolts and the nuts, and
then take the cowling off.
To install the cowling
Place the cowling in the original posi-
tion, and then install the bolts and the
nuts.
1. Cowling B
2. Bolt
1. Quick fastener
2
1
2
1
1. Cowling C
2. Nut
3. Bolt
1. Cowling C
2. Nut
3. Bolt
2
3
1
1
2
3
UBP9E0E0.book Page 8 Wednesday, February 8, 2017 8:34 AM