4-5
CYLINDER HEAD
ENG
Order
Job name / Part name
Q’ty
Remarks
1
2
3
4
5
6
7
8
Cylinder head removal
Timing chain tensioner cap / O-ring
Timing chain tensioner assembly
Cam sprocket / Timing chain
Ignition coil
Cylinder head
Dowel pins
Gasket
Cylinder head gasket
1 / 1
1
1 / 1
1
1
3
1
1
Remove the parts in order.
Refer to “CYLINDER HEAD REMOVAL/
INSTALLATION” section.
Refer to “CYLINDER HEAD
INSTALLATION” section.
Reverse the removal procedure for
installation.
22 Nm (2.2 m
kg)
20 Nm (2.0 m
kg)
5 Nm (0.5 m
kg)
60 Nm (6.0 m
kg)
30 Nm (3.0 m
kg)
CYLINDER HEAD
Summary of Contents for SR125 1997
Page 1: ......
Page 2: ......
Page 8: ......
Page 10: ......
Page 20: ......
Page 44: ...SPEC ...
Page 46: ......
Page 140: ...ENG ...
Page 141: ...CHAPTER 5 CARBURETION CARBURETOR 5 1 CARBURETOR ASSEMBLY 5 4 FUEL LEVEL ADJUSTMENT 5 5 ...
Page 142: ......
Page 148: ...CARB ...
Page 150: ...STEERING INSTALLATION 6 42 REAR SHOCK ABSORBER AND SWINGARM 6 43 SWINGARM INSPECTION 6 44 ...
Page 196: ......
Page 234: ......