37
SPX2000
●
Outline of Tests
1.
MCS (PLLP2) test
Reg. (00, 0f, 10, 16) of PLLP2 is read and written for
comparison check. Reg.12 (Ver.) is read and displayed.
A0..A4 and D0..D15 are checked.
Reg.12 cannot be checked automatically because it is a
read only Reg.
Example of execution screen
MCS(PLLP2)
OK
When testing starts, "testing..." appears on the screen.
"OK" is displayed when the MCS test ends with a
satisfactory result and "NG" when it ends with an
●
List of check items
Item
Test name
Outline of check item
Judgment
1
MCS(PLLP)
Check the register of the gate array PLLP2 by reading/writing.
Auto
2
BATT
Check the voltage of the back-up battery/
Auto
4
DSP6,SIO
Check the register of DSP6 by reading/writing and SIO connection.
Auto
5
MIDI
Check MIDI OUT
➝
IN transmission and reception.
Auto
6
USB MIDI
Check the USB circuit by initializing it and then executing loopback on the external PC.
Auto
7
AES/EBU IN/OUT
Check AES/EBU IN/OUT DIGITAL by executing loopback.
Semi-auto
(DIO)
8
WORD CLOCK
Count the Fs of the oscillator using WCLK IN and check the lock state of PLL.
Semi-auto
9
LCD
Check that the back-light lights up in each color and the entire screen is displayed in black and white. Visual check
10
PANEL LED
Check that LEDs (including 7-segment LEDs) light up in the specified order.
Visual check
11
PANEL ALL LED
Check that all LEDs light up in respective colors,
Visual check
12
PANEL SW
Check switches by pressing them in the specified order,
Semi-auto
13
ANALOG IN/OUT
Check analog input/output.
Visual check
14
NG LOG
Check that a list of test numbers resulted in NG is displayed.
The back-up battery is checked automatically with its
BATTERY
NG
When testing starts, "testing..." appears on the screen.
"OK" is displayed when the battery test ends with a
satisfactory result and "NG" when the measured battery
voltage is 2.8V or lower.
3.
There is no test program specified for No. 3.
4.
DSP6, SIO test
The register of DSP6 is read and written to check the
condition of Data BUS and Address BUS.
The data is read and written in the DRAM of DSP6 via
the register for the comparative check.
The OUT METER SIO connection of DSP6 is checked
by sending and receiving the signal.
Example of execution screen
DSP6
bit23,3,0
NG
When testing starts, "testing..." appears on the screen.
"OK" is displayed when the DSP6 test ends with a
satisfactory result and "NG" when it ends with an
abnormality detected.
Caution
Cancellation of the test is invalid while it is being
executed.
www. xiaoyu163. com
QQ 376315150
9
9
2
8
9
4
2
9
8
TEL 13942296513
9
9
2
8
9
4
2
9
8
0
5
1
5
1
3
6
7
3
Q
Q
TEL 13942296513 QQ 376315150 892498299
TEL 13942296513 QQ 376315150 892498299