PSR-S710/PSR-S910
14
7.
LANL Circuit Board
(Time required: About 8 minutes)
7-1
Remove the lower case assembly. (See procedure 1.)
7-2
Remove the three (3) screws marked [140C]. The
LANL circuit board can then be removed. (Fig. 2)
8.
ENC Circuit Board
(Time required: About 9 minutes)
8-1
Tie a string or the like to the encoder knob. Then, pull
the string to remove the encoder knob from the control
panel side. (Fig. 3, Fig. 5)
8-2
Remove the lower case assembly. (See procedure 1.)
8-3
Remove the four (4) screws marked [570D]. The ENC
circuit board can then be removed. (Fig. 2)
9.
BL Circuit Board (PSR-S710),
LVDS Circuit Board (PSR-S910)
(Time required: About 8 minutes)
9-1
Remove the lower case assembly. (See procedure 1.)
9-2
PSR-S710: Remove the four (4) screws marked
[570E]. The BL circuit board can then be
removed. (Fig. 2)
PSR-S910: Remove the four (4) screws marked
[570E]. The LVDS circuit board can then
be removed. (Fig. 2)
VOLUME KNOB
PUSH KNOB
ENCORDER KNOB
SPEAKER GRILLE ASSEMBLY (L)
SPEAKER GRILLE ASSEMBLY (R)
<Top view>
*
This figure shows the PSR-S910.
Fig. 3
PUSH KNOB
SW
Photo 2
VOLUME KNOB
Fig. 4
ENCODER KNOB
Fig. 5