91
SPEC
P
Route the A.C. magneto lead
behind the idling adjusting screw.
Q
Fasten the idling adjusting screw
and oil pressure switch lead at
the white tape with the plastic
band. Install the plastic band with
its buckle positioned towards the
rear of the machine and its end
facing to the right.
R
Route the oil pressure switch
lead under the idling adjusting
screw, making sure that the lead
is not too taut.
S
Oil pressure switch coupler
T
Starter motor
U
Oil tank outlet hose
V
Oil tank inlet hose
W
Throttle body heater outlet hose
X
Water pump inlet hose
Y
To the wire harness
Z
Route the water pump outlet
hose and throttle body heater
outlet hose behind the engine
mounting bracket.
[
Coolant temperature sensor
\
Throttle body heater inlet hose
]
Thermostat cover
_
To the parking brake
a
To the brake caliper
b
Brake hose
c
Throttle cable
d
Main switch
e
Pass the corrugated tube
(engine stop switch lead, throttle
switch lead, right grip warmer
lead, and thumb warmer lead),
corrugated tube (left grip warmer
lead, grip/thumb warmer adjust-
ment switch lead, brake light
switch lead, and headlight beam
switch lead), parking brake
cable, throttle cable, multi-func-
tion unit lead, and brake hose
with the holder.
Summary of Contents for PHAZER PZ50X
Page 42: ...36 FI ...
Page 70: ...64 SPEC CABLE ROUTING F G H I J K L 7 9 8 A B C 0 D E 1 2 3 4 6 M N O P Q R S T U V W X Z Y 5 ...
Page 72: ...66 SPEC CABLE ROUTING F G H I J K L 7 9 8 A B C 0 D E 1 2 3 4 6 M N O P Q R S T U V W X Z Y 5 ...
Page 74: ...68 SPEC CABLE ROUTING 1 2 3 4 5 6 2 ...
Page 106: ...100 SPEC CABLE ROUTING 1 2 3 4 5 6 ...
Page 108: ...102 SPEC CABLE ROUTING 9 0 1 2 3 4 5 5 6 7 8 PZ50 PZ50GT PZ50RT PZ50MT PZ50VT PZ50MP ...