3-29
1
2
3
4
5
6
7
8
9
10
ENGINE
VALVE
6.
Measure:
• Valve spring tilt “a”
Out of specifications
Replace.
7.
Check:
• Valve spring contact surface “a”
More than 2/3 of the contact surface does not con-
tact
Replace.
CHECKING THE VALVE SEATS
The following procedure applies to all of the valves and
valve seats.
1.
Remove carbon deposits from the valve face and
valve seat.
2.
Apply a small amount of coarse mechanic’s blue lay-
out fluid to the valve face “a”.
Installed compression spring force (Intake):
91.20–104.93 N (9.12–10.49 kgf, 20.50–23.59
lbf)
Installed compression spring force (Exhaust):
91.20–104.93 N (9.12–10.49 kgf, 20.50–23.59
lbf)
Installed length (Intake):
29.0 mm (1.1417 in)
Installed length (Exhaust):
29.0 mm (1.1417 in)
a
Tilt limit:
1.7 mm (0.0669 in)
a
a
Summary of Contents for MX250
Page 2: ...7VE F8197 10_Cover indd 2 2017 03 16 16 24 50 ...
Page 86: ...5 1 1 2 3 4 5 6 7 8 9 10 ELECTRICAL ELECTRICAL CIRCUIT DIAGRAM B B B B B B B B W Y 1 2 3 4 5 ...
Page 100: ...6 6 1 2 3 4 5 6 7 8 9 10 TROUBLESHOOTING GOVERNOR OPERATION MEMO ...
Page 116: ...7 16 1 2 3 4 5 6 7 8 9 10 SPECIFICATIONS WIRE ROUTING DIAGRAM TCI UNIT ...
Page 120: ...APPENDIX CIRCUIT DIAGRAM B B B B B B B B W Y 1 2 3 4 5 ...
Page 122: ...MEMO ...
Page 123: ...7VE F8197 10_Cover indd 2 2017 03 16 16 24 50 ...