9-13
9
2. Install the front carrier by installing the bolts
and tightening them to the specified torques.
3. Install panel A.
Panel C
To remove the panel
1. Remove the seat. (See page 5-21.)
2. Remove panel A.
3. Remove the hoses from panel C.
4. Remove the quick fasteners and bolts.
Tightening torques:
Carrier bolt (upper):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (lower):
34 N·m (3.4 kgf·m, 25 lb·ft)
Carrier bolt (under the fenders):
7 N·m (0.7 kgf·m, 5.2 lb·ft)
1. Panel C
2. Hose
2
1
2
UBDE60E0.book Page 13 Monday, April 22, 2019 4:12 PM