6D93G11
3-10
1
2
3
4
5
6
7
8
9
WARNING
The throttle cable joint must be screwed
in a minimum of 8.0 mm (0.31 in)
c
.
12. Connect the throttle cable joint, install the
clip, and then tighten the locknut.
13. Check the throttle cable for smooth oper-
ation and, if necessary, repeat steps 2–
12.
14. Install the intake silencer.
Checking the gear shift operation
1.
Check that the gear shift operates
smoothly when shifting it from neutral to
forward or reverse. Adjust the shift cable
length if necessary.
2.
Set the gear shift to the neutral position.
3.
Loosen the locknut
1
, remove the clip
2
, and then disconnect the shift cable
joint
3
.
4.
Remove the clip
4
.
5.
Align the alignment mark
a
on the bush-
ing and alignment mark
b
on the
bracket.
6.
Install the clip
4
.
7.
Adjust the position of the shift cable joint
until its hole is aligned with the set pin.
WARNING
The shift cable joint must be screwed in a
minimum of 8.0 mm (0.31 in)
c
.
8.
Connect the cable joint, install the clip,
and then tighten the locknut.
9.
Check the gear shift for smooth operation
and, if necessary, repeat steps 2–8.
S69J3370
c
S6D83140
1
2
3
4
S6D81040
a
b
S69J3370
c
Control system
Summary of Contents for F80BETL
Page 1: ...F80B F100D SERVICE MANUAL 6D9 28197 3G 11 ...
Page 4: ......
Page 46: ...CHK ADJ Periodic checks and adjustments 3 17 6D93G11 MEMO ...
Page 148: ...LOWR Lower unit 6 25 6D93G11 Shimming 6 ...
Page 153: ...6D93G11 6 30 1 2 3 4 5 6 7 8 9 MEMO Backlash ...
Page 215: ...6D93G11 8 12 1 2 3 4 5 6 7 8 9 S60V8265 Br B Fuel control system Starting system ...
Page 245: ...6D93G11 i 5 1 2 3 4 5 6 7 8 9 Index MEMO ...
Page 247: ......
Page 248: ...YAMAHA MOTOR CO LTD Printed in the Netherlands Nov 2004 1 2 1 CR E ...