7-16
Power unit assembly
0
1
2
3
4
5
6
7
8
9
10
A
10. Connect the CDI unit coupler
b
, CDI unit
ground lead
c
, engine shut-off switch
ground lead
d
, and ground lead
c
.
11. Install the engine shut-off switch lead
a
and ground lead
c
to the holders
n
,
o
,
and
p
.
12. Install the bracket
q
, lever
r
, throttle
cam
s
, collar
t
, washer
u
, and holder
v
.
13. Install the throttle link rod
w
and cap
x
.
14. Fasten the engine shut-off switch lead
a
,
CDI unit ground lead
c
, CDI unit lead
e
,
engine shut-off switch ground lead
d
,
and ground leads
c
and
y
using the
plastic ties
z
.
15. Connect the fuel hoses
A
and
B
, and
then fasten them using the clamps
C
.
16. Connect the throttle cables
D
, and then
adjust the throttle cables
D
. See steps
2–9 in “Adjusting the throttle cable and
throttle link” (6-14).
17. Connect the choke cable
E
, and then
install the holder
F
. See steps 9 and 10
in “Installing the primer pump” (6-7).
18. Tighten the choke holder bolt
G
to the
specified torque.
c
c
d
d
c
b
c
c
a
c
p
o
w
q
x
r
s
u
n
v
t
c
z
z
z
c
z
a
d
e
c
y
C
A
C
B
Summary of Contents for F4B
Page 1: ...SERVICE MANUAL 6BV 28197 3M 11 F4B F5A F6C ...
Page 4: ......
Page 16: ...0 11 GEN INFO General information MEMO ...
Page 66: ...5 7 ELEC Electrical system MEMO ...
Page 160: ...8 19 LOWR Lower unit MEMO ...
Page 180: ...9 19 BRKT Bracket unit MEMO ...
Page 198: ...i 5 Index MEMO ...
Page 201: ......
Page 202: ...Jan 2019 ABE E_3 ...