5-40
0
1
2
3
4
5
6
7
8
9
10
A
6.
Remove the special service tool
a
.
7.
Measure the resistance between the
vapor shut-off valve terminals.
8.
Remove the intake manifold (STBD).
9.
Remove the fuse holder
b
, and then
disconnect the fuse holder coupler
b
.
10. Disconnect the engine ECM coupler
c
.
11. Check the wiring harness for continuity.
12. Install the vapor shut-off valve, and then
connect the vapor shut-off valve coupler
a
.
13. Connect the fuse holder coupler
b
, and
then install the fuse holder
b
.
14. Install the intake manifold (STBD) and
intake silencer. See “Installing the intake
manifold” (6-16).
15. Connect the engine ECM coupler
c
.
Charging unit and component
Checking the lighting coil (stator
assembly)
1.
Remove the intake manifold (STBD).
2.
Disconnect the lighting coil couplers
a
and
b
.
3.
Connect the special service tools
a
and
b
.
Vapor shut-off valve resistance:
30.0–34.0
Ω
at 20 °C (68 °F)
a
b
b
c
Wiring harness continuity:
Terminal 1–Terminal 73
Terminal 2–Terminal 19
19
73
2
1
a
b
c
a
b
Fuel control unit and component / Charging unit and component
Summary of Contents for F225F
Page 1: ...SERVICE MANUAL 6CE 28197 3N 11 F L 225F F L 250D F L 300B ...
Page 4: ......
Page 54: ...1 31 SPEC Specification MEMO ...
Page 89: ...2 34 Lower unit 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 263: ...6 28 Canister 0 1 2 3 4 5 6 7 8 9 10 A j k f b ...
Page 477: ...8 98 Shimming counter rotation model 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 537: ...9 58 PTT cylinder 0 1 2 3 4 5 6 7 8 9 10 A MEMO ...
Page 562: ...A 1 MEMO ...
Page 565: ......
Page 566: ...May 2010 1 ABE E_1 YAMAHA MOTOR CO LTD ...
Page 576: ...A 13 ...