DM2000
56
LAMP
LAMP
MADE IN JAPAN
N89
PEAK METER BRIDGE
MODEL MB2000
Front panel
Rear panel
[160G]
<Left side view>
<Right side view>
<Front view>
<Rrar view>
<Bottom view>
Photo.9
35.
Cannon Connector
(Time required: About 15 minutes)
35-1. Remove the rear panel. (See procedure 32.)
35-2. Remove the two (2) screws marked [110] from the
rear side. The cannon connector can then be
removed. (Fig.15)
The opposite cannon connector can be removed in
the same manner.
36.
DSUB Cable
(Time required: About 15 minutes)
36-1. Remove the rear panel. (See procedure 32.)
36-2. Remove the screw marked [150F]. The cable holder
can then be removed. (Fig.15)
36-3. Remove the DSUB cable with the bushing. (Fig.15)
The bushing is not part of the DSUB cable.
When you replace the DSUB cable, you should
remove the bushing from the cable, and attach
in the new cable.
Fig.14
[160G]:Bind Head Tapping Screw-B
A3.0X8 MFZN2BL (VP157000)
Meter angle L
[G]
MB2000
[G]: Bind Head Screw
A4.0X8 MFZN2BL (VP156800)
Summary of Contents for DM 2000 Version 2
Page 80: ...DM2000 80 AD Circuit Board to DSP CN952 CN954 to DSP CN951 CN953 A A 3NA V628540 2 1 ...
Page 82: ...DM2000 82 AD Circuit Board B B 3NA V628540 2 1 ...
Page 83: ...83 DM2000 Pattern side B B 3NA V628540 2 1 ...
Page 88: ...DM2000 88 D D BRG Circuit Board 3NA V628730 2 2 ...
Page 89: ...89 DM2000 D D Pattern side 3NA V628730 2 2 ...
Page 91: ...91 DM2000 CPU Circuit Board Pattern side 3NA V776550 3 3 ...
Page 95: ...95 DM2000 Pattern side DA1 Circuit Board 3NA V628550 1 2 ...
Page 97: ...97 DM2000 Pattern side 3NA V628560 1 DA2 Circuit Board ...
Page 100: ...DM2000 100 F F DSP Circuit Board 3NA V628520 3 1 ...