CABLE ROUTING
2-42
1. Main switch/immobilizer unit
2. Throttle
cable
3. Brake
hose
4. Meter
assembly
5. Cooling system air bleed hose
6. Horn
lead
7. Radiator
fi
ler hose
8. Ignition
coil
9. Coolant reservoir hose
10. Radiator fan motor lead
11. Throttle position sensor coupler
12. Starter motor lead
13. Recti
fi
er/regulator
14. Starting circuit cut-off relay 1
15. Turn signal/hazard relay
16. O
2
sensor
17. V-belt replacement indicator reset coupler
18. O
2
sensor coupler
19. Fuel pump lead
20. Fuel tank breather hose
21. Rear brake lock lever cable
22. Negative battery lead
23. Seat lock cable (left)
24. Frame
25. Wire harness
26. Storage box
27. V-belt replacement indicator reset coupler lead
28. O
2
sensor lead
29. Fuel hose
30. Tail/brake light assembly
31. Main switch lead
A. After adjusting the adjustment nut, attach the
front and rear parts of the boot tightly. Apply the
silicone grease to the inside of the boot and sur-
face of the adjusting nut possible, when install-
ing the boot.
B. Pass the seat lock cable between wire harness
and frame.
C. Use the plastic holder on the back of the frame
to hold the radiator fan motor lead.
D. Connect the wire harness (wire taped area) to
the T stud of frame.
E. Pass the main switch lead between stay 1 and
seat lock cable.
F. After connecting the wire harness and meter
assembly lead, use a plastic holder to connect
them to stay 1.
G. After connecting the left headlight sub-wire har-
ness and wire harness (by matching the cou-
pler colors), fold back the lead facing to the right
and insert it into the air
fi
lter case rib.
H. Connect the wire harness to the headlight sub
wire harness (cowling side).
I. Fasten the headlight and turn signal sub-wire
harness to the stay 1 with a plastic holder.
J. Fasten the ECU (engine) lead to the stay 1 with
a plastic holder. When fastening them using a
plastic holder, make sure not to cross the
branch leads.
K. Fasten the coolant reservoir hose to the stay 1
with a plastic holder.
L. Route the ignition coil lead through the inside of
the ignition coil bracket.
M. Fasten the radiator fan motor lead and side-
stand switch lead to the frame with a plastic
holder.
N. Insert the tail/brake light coupler between the
wire harness and the seat lock cable (left).
O. To the tail/brake light.
P. To the starter relay.
Q. Route the wire harness and recti
fi
er/regulator
lead through the frame wire holder. Place the
recti
fi
er/regulator lead under the wire harness.
R. Make sure that the seat lock cable do not lean
over the storage box.
S. Fasten the starter motor lead, negative battery
lead and seat lock cable (left) to the frame with
a plastic holder.
T. Fasten the starter motor lead and negative bat-
tery lead to the frame with a plastic holder.
U. Fasten the wire harness to the frame with the
plastic band. The buckle of the plastic band
should be facing towards the storage box.
V. Insert the seat lock cable and the cylinder
mounting rubber into the frame stay.
W. Fasten the starter motor lead and negative bat-
tery lead to the frame with a plastic band. Posi-
tion the band clasp on the bottom of the frame
and face the band end to the outside.
X. Install the clamshell cover around the V-belt
replacement indicator reset coupler and O
2
sensor coupler.
Y. Make sure that the V-belt replacement indicator
reset coupler does not project out of the clam-
shell cover.
Z. Fasten the O
2
sensor lead and V-belt replace-
ment indicator reset coupler lead to the frame
with a plastic holder.
AA. Pass the wire harness and seat lock cable in
the frame holder.
AB. Pass the rear brake lock lever cable under the
coolant pipe.
AC. 40
–
50 mm (1.57
–
1.97 in)
AD. Fasten the O
2
sensor lead to the frame with a
plastic band.
AE. Pass the O
2
sensor lead to the lead guide.
AF. Pass the wire harness to the frame wire har-
ness holder.
AG. After making the connections, push the cou-
plers into the space inside the frame above the
mudguard.
AH. Install the band fastened part between frame
and storage box.
AI. Route the seat lock cable through the frame
bracket side and under the wire harness.
AJ. T stud for position setting
AK. Fasten the wire harness, main switch lead and
seat lock cable with a clamp to under the cowl-
ing stay (Fasten the seat lock cables metal pipe
section).
AL. Route the taillight lead onto the seat lock cable,
wire harness and positive battery lead.
AM. Install the turn signal light lead, make sure
does not hide the turn signal light lead under
the tail light assembly as shown area.
Summary of Contents for 2007 XP500
Page 1: ...SERVICE MANUAL XP500 15B 28197 E0 2007 XP500A ...
Page 2: ......
Page 8: ......
Page 36: ...SPECIAL TOOLS 1 27 ...
Page 55: ...TIGHTENING TORQUES 2 18 Crankcase tightening sequence Cylinder head tightening sequence ...
Page 61: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 24 ...
Page 64: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 27 EAS20410 LUBRICATION DIAGRAMS ...
Page 66: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 29 ...
Page 67: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 30 1 Oil strainer 2 Crankshaft ...
Page 68: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 ...
Page 70: ...COOLING SYSTEM DIAGRAMS 2 33 EAS20420 COOLING SYSTEM DIAGRAMS ...
Page 72: ...CABLE ROUTING 2 35 EAS20430 CABLE ROUTING ...
Page 74: ...CABLE ROUTING 2 37 ...
Page 76: ...CABLE ROUTING 2 39 ...
Page 78: ...CABLE ROUTING 2 41 ...
Page 80: ...CABLE ROUTING 2 43 ...
Page 82: ...CABLE ROUTING 2 45 ...
Page 84: ...CABLE ROUTING 2 47 XP500 ...
Page 86: ...CABLE ROUTING 2 49 ...
Page 88: ...CABLE ROUTING 2 51 ...
Page 90: ...CABLE ROUTING 2 53 ...
Page 92: ...CABLE ROUTING 2 55 ...
Page 94: ...CABLE ROUTING 2 57 ...
Page 96: ...CABLE ROUTING 2 59 ...
Page 98: ...CABLE ROUTING 2 61 ...
Page 100: ...CABLE ROUTING 2 63 ...
Page 102: ...CABLE ROUTING 2 65 ...
Page 104: ...REPLACING THE HEADLIGHT BULBS 3 32 ADJUSTING THE HEADLIGHT BEAMS 3 32 ...
Page 138: ...ELECTRICAL SYSTEM 3 34 ...
Page 213: ...INSTALLING THE CHAIN DRIVE 5 75 ...
Page 262: ...CLUTCH 5 49 ...
Page 282: ...CRANKCASE AND CRANKSHAFT 5 69 ...
Page 290: ...CHAIN DRIVE TRANSMISSION 5 77 ...
Page 312: ...THROTTLE BODIES 7 9 ...
Page 316: ...IGNITION SYSTEM 8 1 EAS27090 IGNITION SYSTEM EAS27110 CIRCUIT DIAGRAM ...
Page 320: ...ELECTRIC STARTING SYSTEM 8 5 EAS27160 ELECTRIC STARTING SYSTEM EAS27170 CIRCUIT DIAGRAM XP500 ...
Page 322: ...ELECTRIC STARTING SYSTEM 8 7 XP500A ...
Page 326: ...ELECTRIC STARTING SYSTEM 8 11 ...
Page 330: ...CHARGING SYSTEM 8 15 EAS27200 CHARGING SYSTEM EAS27210 CIRCUIT DIAGRAM ...
Page 331: ...CHARGING SYSTEM 8 16 2 AC magneto 3 Rectifier regulator 16 Battery 17 Main fuse ...
Page 333: ...CHARGING SYSTEM 8 18 ...
Page 334: ...LIGHTING SYSTEM 8 19 EAS27240 LIGHTING SYSTEM EAS27250 CIRCUIT DIAGRAM ...
Page 337: ...LIGHTING SYSTEM 8 22 ...
Page 338: ...SIGNALING SYSTEM 8 23 EAS27270 SIGNALING SYSTEM EAS27280 CIRCUIT DIAGRAM ...
Page 343: ...SIGNALING SYSTEM 8 28 ...
Page 344: ...COOLING SYSTEM 8 29 EAS27300 COOLING SYSTEM EAS27310 CIRCUIT DIAGRAM ...
Page 347: ...COOLING SYSTEM 8 32 ...
Page 348: ...FUEL INJECTION SYSTEM 8 33 EAS27330 FUEL INJECTION SYSTEM EAS27340 CIRCUIT DIAGRAM ...
Page 372: ...IMMOBILIZER SYSTEM 8 57 EAS27640 IMMOBILIZER SYSTEM EAS27650 CIRCUIT DIAGRAM ...
Page 382: ...ABS ANTI LOCK BRAKE SYSTEM XP500A 8 67 EAS27740 ABS COMPONENTS CHART ...
Page 384: ...ABS ANTI LOCK BRAKE SYSTEM XP500A 8 69 EAS27750 ABS CONNECTOR LOCATION CHART 2 1 6 5 3 4 7 ...
Page 392: ...ABS ANTI LOCK BRAKE SYSTEM XP500A 8 77 EAS27810 BASIC PROCESS FOR TROUBLESHOOTING ...
Page 411: ...ABS ANTI LOCK BRAKE SYSTEM XP500A 8 96 ...
Page 414: ...ELECTRICAL COMPONENTS 8 99 1 2 3 4 5 6 7 8 9 10 11 12 13 ...
Page 419: ...ELECTRICAL COMPONENTS 8 104 ...
Page 445: ......
Page 446: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...