RADIATOR
6-3
EAS26390
CHECKING THE RADIATOR
1. Check:
• Radiator fins
Obstruction
→
Clean.
Apply compressed air to the rear of the radia-
tor.
Damage
→
Repair or replace.
NOTE:
Straighten any flattened fins with a thin, flat-head
screwdriver.
2. Check:
• Radiator hoses
• Radiator pipes
Cracks/damage
→
Replace.
3. Measure:
• Radiator cap opening pressure
Below the specified pressure
→
Replace the
radiator cap.
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
a. Install the radiator cap tester “1” and radiator
cap tester adapter “2” to the radiator cap “3”.
b. Apply the specified pressure for ten seconds
and make sure there is no drop in pressure.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
4. Check:
• Radiator fan
Damage
→
Replace.
Malfunction
→
Check and repair.
Refer to “COOLING SYSTEM” on page 8-37.
EAS26400
INSTALLING THE RADIATOR
1. Fill:
• Cooling system
(with the specified amount of the recom-
mended coolant)
Refer to “CHANGING THE COOLANT” on
page 3-19.
2. Check:
• Cooling system
Leaks
→
Repair or replace any faulty part.
3. Measure:
• Radiator cap opening pressure
Below the specified pressure
→
Replace the
radiator cap.
Refer to “CHECKING THE RADIATOR” on
page 6-3.
Radiator cap opening pressure
93.3–122.7 kPa (13.5–17.8 psi)
(0.93–1.23 kgf/cm²)
Radiator cap tester
90890-01325
Radiator pressure tester
YU-24460-01
Radiator cap tester adapter
90890-01352
Radiator pressure tester adapter
YU-33984
Summary of Contents for 2006 FJR1300A
Page 1: ...2006 SERVICE MANUAL FJR1300A V 3P6 28197 E0 ...
Page 6: ......
Page 8: ......
Page 73: ...TIGHTENING TORQUES 2 24 1 2 3 4 ...
Page 77: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 28 ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 3 2 ...
Page 83: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 6 5 4 3 2 1 ...
Page 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 2 3 4 5 6 7 8 9 ...
Page 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 4 5 3 2 1 9 8 6 7 ...
Page 92: ...COOLING SYSTEM DIAGRAMS 2 43 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Page 98: ...CABLE ROUTING 2 49 A B C D E 1 1 2 3 4 5 6 7 8 9 11 10 12 ...
Page 100: ...CABLE ROUTING 2 51 A B C 1 2 3 4 6 5 7 8 9 10 11 12 ...
Page 108: ...CABLE ROUTING 2 59 D A B B C E 1 2 3 4 ...
Page 114: ...CABLE ROUTING 2 65 ...
Page 117: ......
Page 166: ...GENERAL CHASSIS 4 9 b a 1 2 ...
Page 258: ...SHAFT DRIVE 4 101 ...
Page 278: ...CAMSHAFTS 5 17 ...
Page 370: ...BALANCERS 5 109 ...
Page 386: ...WATER PUMP 6 15 ...
Page 396: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Page 411: ...IGNITION SYSTEM 8 8 ...
Page 419: ...ELECTRIC STARTING SYSTEM 8 16 ...
Page 421: ...CHARGING SYSTEM 8 18 2 Rectifier regulator 3 AC magneto 7 Main fuse 8 Battery ...
Page 423: ...CHARGING SYSTEM 8 20 ...
Page 439: ...SIGNALING SYSTEM 8 36 ...
Page 443: ...COOLING SYSTEM 8 40 ...
Page 489: ...FUEL PUMP SYSTEM 8 86 ...
Page 495: ...WINDSHIELD DRIVE SYSTEM 8 92 ...
Page 501: ...ACCESSORY BOX SYSTEM 8 98 ...
Page 512: ...IMMOBILIZER SYSTEM 8 109 a Light on b Light off ...
Page 513: ...IMMOBILIZER SYSTEM 8 110 ...
Page 519: ...ABS ANTI LOCK BRAKE SYSTEM 8 116 ...
Page 550: ...ELECTRICAL COMPONENTS 8 147 1 17 16 18 19 3 2 4 5 6 7 8 9 10 11 12 13 14 15 ...
Page 573: ...ELECTRICAL COMPONENTS 8 170 c Measure the accessory box solenoid resis tance B Br 1 2 ...
Page 574: ...ELECTRICAL COMPONENTS 8 171 ...
Page 581: ......
Page 582: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...