CONNECTING RODS AND PISTONS
5-85
2. Install:
• Piston ring
(into the cylinder)
NOTE:
Level the piston ring into the cylinder with the
piston crown.
3. Measure:
• Piston ring end gap
Out of specification
→
Replace the piston
ring.
NOTE:
The oil ring expander spacer’s end gap cannot
be measured. If the oil ring rail’s gap is exces-
sive, replace all three piston rings.
EAS24440
CHECKING THE PISTON PIN
The following procedure applies to all of the pis-
ton pins.
1. Check:
• Piston pin
Blue discoloration/grooves
→
Replace the
piston pin and then check the lubrication sys-
tem.
2. Measure:
• Piston pin outside diameter “a”
Out of specification
→
Replace the piston pin.
3. Measure:
• Piston pin bore diameter “b”
Out of specification
→
Replace the piston.
4. Calculate:
• Piston-pin-to-piston-pin-bore clearance
Out of specification
→
Replace the piston pin
and piston as a set.
a. 5 mm (0.20 in)
Piston ring
Top ring
End gap (installed)
0.35–0.45 mm (0.0138–0.0177
in)
Limit
0.70 mm (0.0276 in)
2nd ring
End gap (installed)
0.75–0.85 mm (0.0295–0.0335
in)
Limit
1.20 mm (0.0472 in)
Oil ring
End gap (installed)
0.20–0.60 mm (0.0079–0.0236
in)
Piston pin outside diameter
18.991–19.000 mm (0.7477–
0.7480 in)
Limit
18.971 mm (0.7469 in)
Piston pin bore inside diameter
19.004–19.015 mm (0.7482–
0.7486 in)
Limit
19.045 mm (0.7498 in)
• Piston-pin-to-piston-pin-bore clearance =
Piston pin bore diameter “b” -
Piston pin outside diameter “a”
Piston-pin-to-piston-pin-bore
clearance
0.004–0.024 mm (0.00016–
0.00094 in)
Summary of Contents for 2006 FJR1300A
Page 1: ...2006 SERVICE MANUAL FJR1300A V 3P6 28197 E0 ...
Page 6: ......
Page 8: ......
Page 73: ...TIGHTENING TORQUES 2 24 1 2 3 4 ...
Page 77: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 28 ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 3 2 ...
Page 83: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 6 5 4 3 2 1 ...
Page 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 2 3 4 5 6 7 8 9 ...
Page 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 4 5 3 2 1 9 8 6 7 ...
Page 92: ...COOLING SYSTEM DIAGRAMS 2 43 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Page 98: ...CABLE ROUTING 2 49 A B C D E 1 1 2 3 4 5 6 7 8 9 11 10 12 ...
Page 100: ...CABLE ROUTING 2 51 A B C 1 2 3 4 6 5 7 8 9 10 11 12 ...
Page 108: ...CABLE ROUTING 2 59 D A B B C E 1 2 3 4 ...
Page 114: ...CABLE ROUTING 2 65 ...
Page 117: ......
Page 166: ...GENERAL CHASSIS 4 9 b a 1 2 ...
Page 258: ...SHAFT DRIVE 4 101 ...
Page 278: ...CAMSHAFTS 5 17 ...
Page 370: ...BALANCERS 5 109 ...
Page 386: ...WATER PUMP 6 15 ...
Page 396: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Page 411: ...IGNITION SYSTEM 8 8 ...
Page 419: ...ELECTRIC STARTING SYSTEM 8 16 ...
Page 421: ...CHARGING SYSTEM 8 18 2 Rectifier regulator 3 AC magneto 7 Main fuse 8 Battery ...
Page 423: ...CHARGING SYSTEM 8 20 ...
Page 439: ...SIGNALING SYSTEM 8 36 ...
Page 443: ...COOLING SYSTEM 8 40 ...
Page 489: ...FUEL PUMP SYSTEM 8 86 ...
Page 495: ...WINDSHIELD DRIVE SYSTEM 8 92 ...
Page 501: ...ACCESSORY BOX SYSTEM 8 98 ...
Page 512: ...IMMOBILIZER SYSTEM 8 109 a Light on b Light off ...
Page 513: ...IMMOBILIZER SYSTEM 8 110 ...
Page 519: ...ABS ANTI LOCK BRAKE SYSTEM 8 116 ...
Page 550: ...ELECTRICAL COMPONENTS 8 147 1 17 16 18 19 3 2 4 5 6 7 8 9 10 11 12 13 14 15 ...
Page 573: ...ELECTRICAL COMPONENTS 8 170 c Measure the accessory box solenoid resis tance B Br 1 2 ...
Page 574: ...ELECTRICAL COMPONENTS 8 171 ...
Page 581: ......
Page 582: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...