SHAFT DRIVE
4-95
• Apply LOCTITE
®
onto the stopper bolt.
4. Measure:
• Ring-gear-to-stopper-bolt clearance
NOTE:
If the ring-gear-to-stopper-bolt clearance is out
of specification, repeat the above procedure.
EAS23620
DISASSEMBLING THE FINAL DRIVE
ASSEMBLY
1. Remove:
• Ring gear bearing housing bolts “1”
• Ring gear bearing housing nuts “2”
NOTE:
Working in a crisscross pattern, loosen each bolt
and nut 1/4 of a turn. After all of the bolts and
nuts are fully loosened, remove them.
2. Remove:
• Coupling gear nut
• Coupling gear “1”
(with the coupling gear/middle shaft tool “2”)
3. Remove:
• Bearing retainer
(with the bearing retainer wrench “1”)
CAUTION:
ECA14330
The bearing retainer has left-hand threads.
To loosen the bearing retainer, turn it clock-
wise.
4. Remove:
• Final drive pinion gear
WARNING
EWA13800
Always use new bearings.
CAUTION:
ECA14340
The final drive pinion gear should only be re-
moved if ring gear replacement is necessary.
NOTE:
Lightly tap on the end of the final drive pinion
gear with a soft hammer.
Ring-gear-to-stopper-bolt clear-
ance
0.30–0.60 mm (0.0118–0.0236 in)
Coupling gear/middle shaft tool
90890-01229
Gear holder
YM-01229
Bearing retainer wrench
90890-04050
Pinion bearing retainer & remov-
er
YM-04050
Summary of Contents for 2006 FJR1300A
Page 1: ...2006 SERVICE MANUAL FJR1300A V 3P6 28197 E0 ...
Page 6: ......
Page 8: ......
Page 73: ...TIGHTENING TORQUES 2 24 1 2 3 4 ...
Page 77: ...LUBRICATION POINTS AND LUBRICANT TYPES 2 28 ...
Page 80: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 31 EAS20410 LUBRICATION DIAGRAMS 5 6 7 1 2 3 4 ...
Page 82: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 33 1 3 2 ...
Page 83: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 34 1 Main axle 2 Drive axle 3 Oil delivery pipe 1 ...
Page 84: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 35 6 5 4 3 2 1 ...
Page 86: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 37 1 2 3 4 5 6 7 8 9 ...
Page 88: ...LUBRICATION SYSTEM CHART AND DIAGRAMS 2 39 4 5 3 2 1 9 8 6 7 ...
Page 92: ...COOLING SYSTEM DIAGRAMS 2 43 A A 7 1 2 3 4 5 5 7 8 6 8 9 10 11 12 ...
Page 98: ...CABLE ROUTING 2 49 A B C D E 1 1 2 3 4 5 6 7 8 9 11 10 12 ...
Page 100: ...CABLE ROUTING 2 51 A B C 1 2 3 4 6 5 7 8 9 10 11 12 ...
Page 108: ...CABLE ROUTING 2 59 D A B B C E 1 2 3 4 ...
Page 114: ...CABLE ROUTING 2 65 ...
Page 117: ......
Page 166: ...GENERAL CHASSIS 4 9 b a 1 2 ...
Page 258: ...SHAFT DRIVE 4 101 ...
Page 278: ...CAMSHAFTS 5 17 ...
Page 370: ...BALANCERS 5 109 ...
Page 386: ...WATER PUMP 6 15 ...
Page 396: ...AIR INDUCTION SYSTEM 7 9 EAS27040 AIR INDUCTION SYSTEM 1 2 3 4 5 1 1 1 1 2 2 5 2 3 3 4 7 8 6 ...
Page 411: ...IGNITION SYSTEM 8 8 ...
Page 419: ...ELECTRIC STARTING SYSTEM 8 16 ...
Page 421: ...CHARGING SYSTEM 8 18 2 Rectifier regulator 3 AC magneto 7 Main fuse 8 Battery ...
Page 423: ...CHARGING SYSTEM 8 20 ...
Page 439: ...SIGNALING SYSTEM 8 36 ...
Page 443: ...COOLING SYSTEM 8 40 ...
Page 489: ...FUEL PUMP SYSTEM 8 86 ...
Page 495: ...WINDSHIELD DRIVE SYSTEM 8 92 ...
Page 501: ...ACCESSORY BOX SYSTEM 8 98 ...
Page 512: ...IMMOBILIZER SYSTEM 8 109 a Light on b Light off ...
Page 513: ...IMMOBILIZER SYSTEM 8 110 ...
Page 519: ...ABS ANTI LOCK BRAKE SYSTEM 8 116 ...
Page 550: ...ELECTRICAL COMPONENTS 8 147 1 17 16 18 19 3 2 4 5 6 7 8 9 10 11 12 13 14 15 ...
Page 573: ...ELECTRICAL COMPONENTS 8 170 c Measure the accessory box solenoid resis tance B Br 1 2 ...
Page 574: ...ELECTRICAL COMPONENTS 8 171 ...
Page 581: ......
Page 582: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...