4 - 28
ENG
VALVES AND VALVE SPRINGS
2. Replace:
• valve guide
▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼ ▼▼▼
▼
▼▼▼
NOTE:
_
To ease guide removal, installation and to
maintain correct fit, heat the cylinder head to
100 °C (212 °F) in an oven.
a. Remove the valve guide using a valve guide
remover
1
.
b. Install the new valve guide using a valve
guide remover
1
and valve guide installer
2
.
c. After installing the valve guide, bore the
valve guide using a valve guide reamer
3
to obtain proper stem-to-guide clearance.
NOTE:
_
After replacing the valve guide reface the valve
seat.
▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲ ▲▲▲
▲
▲▲▲
3. Check:
• valve face
Pitting/wear
→
Grind the face.
• valve stem end
Mushroom shape or diameter larger than
the body of the stem
→
Replace.
Valve guide remover
Intake (ø 4.5)
P/N. YM-04116/90890-04116
Exhaust (ø 5)
P/N. YM-04097/90890-04097
Valve guide installer
Intake (ø 4.5)
P/N. YM-04117/90890-04117
Exhaust (ø 5)
P/N. YM-04098/90890-04098
Valve guide reamer
Intake (ø 4.5)
P/N. YM-04118/90890-04118
Exhaust (ø 5)
P/N. YM-04099/90890-04099
Summary of Contents for 2003 YFZ450S
Page 1: ...YFZ450S5TG2 AE1 SERVICE MANUAL ...
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ...GEN INFO ...
Page 20: ......
Page 21: ...SPEC 2 ...
Page 23: ...SPEC ...
Page 34: ...2 11 SPEC ENGINE SPECIFICATIONS Cylinder head tightening sequence ...
Page 69: ......
Page 70: ...CHK ADJ 3 ...
Page 139: ...ENG 4 ...
Page 143: ...ENG ...
Page 224: ...COOL 5 ...
Page 226: ...COOL ...
Page 234: ......
Page 235: ...CARB 6 ...
Page 237: ...CARB ...
Page 248: ...CHAS 7 ...
Page 320: ......
Page 321: ...ELEC 8 ...
Page 323: ... ELEC ...
Page 338: ...8 15 ELEC IGNITION SYSTEM 4 Install throttle lever cover ...
Page 366: ...TRBL SHTG 9 ...
Page 368: ...TRBL SHTG ...
Page 374: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...