2 - 25
SPEC
COOLANT FLOW DIAGRAMS
È
Install the radiator outlet hose with the white paint mark parallel to the ground as shown.
É
Install the radiator outlet hose completely on the radiator pipe until the hose contacts the flange of the pipe.
Ê
30 mm (1.18 in)
Ë
Install the radiator outlet hose onto the water pump inlet pipe until the end of the hose reaches the middle
of the blue paint mark on the pipe.
Ì
Align the white paint mark on the radiator inlet hose with the projection on the radiator pipe.
Í
Install the radiator inlet hose onto the radiator pipe until the end of the hose contacts the projection of the
pipe.
Î
Install the radiator inlet hose onto the outlet pipe of the cylinder head water jacket until the end of the hose
reaches the middle of the blue paint mark on the pipe.
7
8
1
2
3
4
5
6
9
Î
Ê
È
É
Ê
Ë
Í
Ì
A
B
C
D-D
C
A
B
D
D
Summary of Contents for 2003 YFZ450S
Page 1: ...YFZ450S5TG2 AE1 SERVICE MANUAL ...
Page 2: ......
Page 8: ......
Page 9: ...GEN INFO 1 ...
Page 11: ...GEN INFO ...
Page 20: ......
Page 21: ...SPEC 2 ...
Page 23: ...SPEC ...
Page 34: ...2 11 SPEC ENGINE SPECIFICATIONS Cylinder head tightening sequence ...
Page 69: ......
Page 70: ...CHK ADJ 3 ...
Page 139: ...ENG 4 ...
Page 143: ...ENG ...
Page 224: ...COOL 5 ...
Page 226: ...COOL ...
Page 234: ......
Page 235: ...CARB 6 ...
Page 237: ...CARB ...
Page 248: ...CHAS 7 ...
Page 320: ......
Page 321: ...ELEC 8 ...
Page 323: ... ELEC ...
Page 338: ...8 15 ELEC IGNITION SYSTEM 4 Install throttle lever cover ...
Page 366: ...TRBL SHTG 9 ...
Page 368: ...TRBL SHTG ...
Page 374: ...YAMAHA MOTOR CO LTD 2500 SHINGAI IWATA SHIZUOKA JAPAN ...