
61U5H11
5-50
9
8
7
6
5
4
3
2
1
Crankcase
3.
Install the apron
7
, and then tighten the
apron bolt
8
to specified torque.
4.
Connect the cooling water pilot hose
9
and PCV hose
0
.
5.
Install the manual injection pump cable
end, and start-in-gear protection cable
end, and then install the bracket bolt
q
.
9
0
61U50335
Apron bolt
8
:
8 N·m (0.8 kgf·m, 5.9 ft·lb)
7
61U50585
8
8
8
8
7
61U50465
q
6.
Install the bushing
w
and clip
e
.
7.
Connect the choke link rod.
8.
Connect the 10-pin main harness coupler
r
.
9.
Connect the shift cable
t
and throttle
cable
y
, and then adjust their lengths.
For adjustment procedures, see P3-6,
“Adjusting the throttle cable,” and P3-7
“Checking the gear shift operation”.
y
t
61U50575
w
e
6G450905
61U50475
r
61U5H11_05_1 06.2.10 17:22 Page 53
Summary of Contents for 115B
Page 1: ...115B SERVICE MANUAL 61U 28197 5H 11 140B E115A E115A 115B 140B ...
Page 4: ......
Page 79: ...61U5H11 4 18 9 8 7 6 5 4 3 2 1 MEMO ...
Page 136: ...POWR 5 55 61U5H11 Power unit MEMO ...
Page 159: ...61U5H11 6 22 9 8 7 6 5 4 3 2 1 Shimming Shimming 6G46090E T3 M3 M4 M1 M2 T1 T2 F R P ...
Page 255: ......