![YAMADA 140 Series Instruction Download Page 10](http://html.mh-extra.com/html/yamada/140-series/140-series_instruction_894484010.webp)
5
Normally, the product is delivered with the pump already installed. If you have dismounted the pump for
maintenance or replacement, mount it again according to the following procedure. The lift is compatible with
any of the following pumps: SR140P25-P (854557), SR140P38-P (854558), SR140P50-P (854559)
①
Mounting pump on lift
Remove the check valve from the outlet of the pump.
Lift the pump using the eye nut on the top. Put the mounting plate
of the pump on the pump base of the lift. Align the holes on the
mounting plate with the screw holes on the pump base. Insert
four bolts with wave spring washers and tighten them securely.
(Fig. 5)
Wrap sealing tape around the thread of the check valve and put
the valve back.
②
Connecting pump to inductor plate
Insert the lower part of the pump through the gasket into the
inductor plate. Rotate the holes in the gasket and flanged part of
the pump to align with the bolt holes in the inductor plate. Insert
bolts with wave spring washers through each hole and tighten
them securely. (Fig. 6)
Make sure the air release plug is positioned in the front side of the
pump facing away from the bleeder valve.
Insert the air tube hanging from the “AIR” button into the inductor
plate. (Fig. 7)
③
Connecting delivery piping
Refer to “2.2 Discharge piping”.
④
Connecting air piping
Connect air piping equipment such as an air valve and air
regulator to the air inlet of the pump by referring to “2.3 Air piping”.
Also, connect an air tube to the lift. (Fig. 8)
Fig. 8
Fig. 6
Connecting pump to inductor plate
Pump
Bolt
Gasket
Inductor plate
Fig. 7
Tube connection
port
Lifting point
Mounting plate
Fig. 5
Mounting pump on lift
Check valve