![Yale SLE 3 Operation Manual Download Page 7](http://html1.mh-extra.com/html/yale/sle-3/sle-3_operation-manual_3104548007.webp)
1
General information
09.2019
7
ba
-o
.4
.1
.3
-en
-2
.2
-y
1.6
Target group
ATTENTION
All work for installation and troubleshooting must be carried out by an
electrically
skilled person
, commissioning and maintenance by a
competent person
.
Electrically skilled person
An electrically skilled person is a person who on account of his technical training has
knowledge of and experience with electrical systems and, knowing the applicable
standards and regulations, is able to assess the work assigned to him and identify and
avert possible dangers.
The electrically skilled person must be familiar with operation of the product and
trained in this.
Definition of a competent person
A competent person is a person who on account of his vocational training, vocational
experience and recent vocational activity has the necessary technical knowledge to
test the equipment.
This person must be able to assess the safety of the system in dependence on the
case of use. Competent persons authorised to carry out certain maintenance work on
our products are the manufacturer's service technicians and trained technicians with
certificate.
1.7
Warranty claims
WARNING
Prerequisite for trouble-free operation of the device and fulfilment of warranty claims is
compliance with the operating instructions.
•
Read the operating instructions before you work with the device.
•
Always only use the device for its intended purpose. Pay attention to the contents in
the sections "Technical data", "Intended use" and "Misuse", particularly to the condi-
tions for transport, storage, installation, commissioning and operation.
•
These operating instructions only describe the basic functions of the device.
•
Do not open the enclosure to make unauthorised changes to the device.
•
Always switch off the power supply when carrying out maintenance work (e.g.
replacement of the device).
1.8
Misuse
WARNING
They device may
only
be used according to the instructions and information in this
manual.
1.9
Commissioning / Operation / Documentation
WARNING
The
SLE 3
only achieves its safety function when it has been programmed accordingly.
The commissioning of a hoist must be documented. This documentation must also
contain the overload cut-off point. The signature of the
qualified person
and the operator
is needed after commissioning (section
“Commissioning and testing”
).