Yale HW 30 C Operating Instructions Manual Download Page 4

4

THE WINCH

Do not exceed the capacity of each rope layer.

Before taking into operation, a competent

person must check:

- the lifting device

- the load bearing parts of the structure

- the carrying medium

- mounting

DAILY EXAMINATIONS

- brake functions

- condition of the rope and loading device

- load bearing parts of the structure.

- the load carrying medium

LOAD ATTACHMENT DEVICE

- check it has sufficient carrying capacity

- load hooks must have safety catches

- load hooks must be secured to the rope with

a solid eye and high pressure rope clamp

and tested according to the regulations

- fix the load correctly

- do not use the winch rope as a hitching

device.

The winch should be given a thorough

examination by a competent person at

least once a year.

Always ensure the maintenance inter-

vals are adhered to.

Only use original accessories and spa-

re parts; otherwise safe function is not

guaranteed.

TECHNICAL DATA (see Tab. 1)

FUNCTIONAL DESCRIPTION

The hand winches are drum winches with spur

gear. The load is automatically held by load

pressure brake.

The winch housing is made of plated steel and

is suitable for mounting, especially onto walls,

masts and similar installations.

The bearing of the rope drum is through rolling

bearing respectively friction bearing.

MOUNTING INSTRUCTIONS

Mounting:

ATTENTION:

- The mounting structure must be designed

to sustain the max. forces imposed by the

winch

- Pay attention that the mounting surface is

flat and true

- Only fix the winch by means of good quality

screws

- Tighten the screws evenly

- Secure the screws

- Ensure that the crank is free running (crank

clearance)

Wire rope fixing

Attention:

 With wrong rope coiling the brake

is not effective.

Rope coiling has to accordingly the connec-

tion of the winch. The winch should be turned

180

°

 when installed with a downward going

rope descent direction.

Attention:

 Pay to correct rope direction.

The fastening of the wire rope has to becar-

ried out as follows:

Move the screw with hole through a bore hole

in the side plate (see Fig. 6). Guide the end of

the wire rope through the hole in the screw.

From the outside adjust the nut (see Fig. 7)

and tighten the nut by hand force.

Attention:

 For rope selection pay to the tech-

nical data for the rope.

Calculate the rope length in such a way that

at least 3 full turns of rope remain on the drum

in lowest load position.

OPERATING INSTRUCTIONS

The winch must first be run with 50%

of the nominal load before operation.

Before operating the winch the drum must

have at least 3 rotations with 50 % of the no-

minal load. The grease of the wormgearing

should be put back into the gearing by means

of a brush. After this operation the winch can

be put into full use.

At least 

25 % of the nominal load

 must be

on the winch as load for the proper working of

the friction brake.

SAFETY INSTRUCTION

The winches are only suited for manual

operation.

- Lifting the load by turning the crank in clock-

wise direction.

- Lowering the load by turning the crank in

counter-clockwise direction.

INSPECTION- AND MAINTENANCE

INSTRUCTIONS

Safety Instruction

Before carrying out inspection and main-

tenance works (see Tab. 2) ensure the winch

is unloaded.

The working life of the winch is limited, wea-

ring parts have to be replaced in good time.

RECOMMENDED LUBRICANT

For all grease lubricating points:

Multipurpose grease acc. to DIN 51825

 T1 K 2 K

Waste lubricant has to be disposed acc. to

legal regulations!

OPERATING FAILURES AND THEIR

CAUSES (see Tab. 3)

DISPOSAL

After having placed out of service, the parts

of the hand winch have to be recycled or dis-

posed according to legal regulations!

Summary of Contents for HW 30 C

Page 1: ...riebsanleitung Operating Instructions D GB Mod HW C Mod HW CS Yale Industrial Products GmbH Postfach 10 13 24 D 42513 Velbert Germany Am Lindenkamp 31 D 42549 Velbert Germany Tel 02051 600 0 Fax 02051 600 127 Ident Nr 09900626 05 2008 ...

Page 2: ...ng Montage und Wartung nur durch Beauftragte Eingewiesene mit den Vorschriften vertraute Personen Achtung Den Bremsmechanismus nicht fetten oder ölen Das Befördern von Personen sowie der Auf enthalt im Gefahrenbereich ist verboten Der Aufenthalt unter einer angehobenen Last ist verboten Nie in bewegliche Teile greifen Mängel sind sofort sachkundig zu beheben DIE LAST nie in gehobenen Zustand unbea...

Page 3: ...allowed to swing must not fall into the wire rope never move in areas which are not in clear view Total lifting area must be totally visible THE ROPE should only be used for lifting lowering or pulling of various loads and must not be used for any other purpose at least 3 full turns of rope should remain on the drum when loaded fleet angle see Picture for standard wire rope 3 for special rope 1 5 ...

Page 4: ...has to accordingly the connec tion of the winch The winch should be turned 180 when installed with a downward going rope descent direction Attention Pay to correct rope direction The fastening of the wire rope has to becar ried out as follows Move the screw with hole through a bore hole in the side plate see Fig 6 Guide the end of the wire rope through the hole in the screw From the outside adjust...

Page 5: ...5 Fig 3 Fig 4 Fig 1 Fig 2 Fig 5 Fig 5 Fig 6 Schraube mit Bohrung Srew with hole through Mutter Nut ...

Page 6: ...inimale Bruchgrenze Seil kN 13 6 34 8 13 6 34 8 Minimum breaking power rope Maximale Seilaufnahme m 20 15 20 15 Max rope reception Maximale Seillagen 9 7 9 7 Max number of layers Erforderliche Kurbelkraft daN 22 20 22 20 Required crank force Übersetzung 4 2 1 10 1 4 2 1 10 1 Ratio Hub je Kurbelumdrehung 1 Seillage mm 40 26 40 26 Average lift per full turn of crank Gewicht ohne Seil kg 13 16 26 28 ...

Page 7: ...laced by a competent person1 Attention No lubricant must be brought to the brake discs and their stopping faces Seil gemäß DIN 15020 Blatt 2 auf Verschleiß und auf minimale Bruchkraft prüfen und warten Examine the rope for wear according to DIN 15020 page 2 and execute maintenance works Check cable on minimum breaking power Befestigungsschrauben auf festen Sitz prüfen Check the fixing screws for f...

Page 8: ...ruckbremse öffnet nicht Last läßt sich nur unter großem Kraftaufwand absenken Operating failures and their causes Failure In unloaded state it is difficult to turn the crank Load is not held The load pressure brake does not release load may only be lowered with high expenditure of force Cause Lubricant gearing is missing Dirt or something similar has accumulated in the gearing Winch was distorted ...

Page 9: ...9 ...

Page 10: ...10 ...

Page 11: ...N 15404 BGV D8 BGR 500 Qualitätssicherung DIN EN ISO 9001 2000 EC Declaration of Conformity 2006 42 EC Appendix II A We hereby declare that the design construction and commercialised execution of the below mentioned machine complies with the essential health and safety requirements of the EC Machinery Directive The validity of this declaration will cease in case of any modification or supplement n...

Page 12: ...rading division of Columbus McKinnon Corporation Ltd Unit 12 Loughside Industrial Park Dargan Crescent Belfast BT3 9JP Phone 00 44 0 28 90 7714 67 Fax 00 44 0 28 90 771473 Web Site www yaleproducts com E mail sales uk cmworks com Italy Columbus McKinnon Italia Srl Via P Picasso 32 20025 Legnano MI Italy Phone 00390331576329 Fax 00390331468262 Web Site www cmworks com E mail info cmco it Spain and ...

Reviews: