Yale 50 Series Installation Instructions Manual Download Page 6

80-9350-2531-010  Rev 2  02/23

Yale Commercial is a business associated with ASSA ABLOY Access and Egress Hardware Group, Inc., an ASSA ABLOY Group 
company. Copyright © 2016, 2023 ASSA ABLOY Access and Egress Hardware Group, Inc. All rights reserved.
Reproduction in whole or in part without the express written permission of ASSA ABLOY Access and Egress Hardware Group, Inc. is prohibited. 
Patentpending and/or patent www.assaabloydss.com/patents. 

Yale Locks & Hardware

 

Monroe, NC 28112  USA 

Tel: 1-800-438-1951 

Fax: 1-800-338-0965 

yalecommercial.com

50 Series Parallel Arm Installation (Right Hand Shown) cont.

6. Remove arm and attach as shown.

7. Open latch and sweep valves.

Do not completely 

open valves. Valves 

will leak.

Arm under tension. 

Keep fingers away 

from moving parts.

8. Connect arms and install forearm screw.

1st

2nd

Left Hand

Door

or

Right Hand

Door

Flat

Flat

RH: Position flat at R

LH: Position flat at L

1st

2nd

9. Preload spring and tighten forearm screw.

1-1/2

(38)

1st

2nd

3rd

By hand, rotate 

arm elbow to 

be 1-1/2" from 

door face.

Rotating arm 

preloads closer 

spring power.

3rd

The 

50 Series Non Hold Open Closer - Parallel Arm Mount

 has now been installed. 

🛑

 Go to page 2 for closer adjustments and decorative cap or cover installation. 

Approved 2023-02-24

Reviews: