1031908E-2/8
If yoU hAve bARs ThAT cAn be moved…
Move the bars to 30” (76cm) apart.
Load baSkeT onTo rackS.
center basket over your rack’s crossbars.
do noT ATTAch bRAcKeTs
To unSTabLe PoInTS.
do not attach brackets at these locations.
•If you have fIxed bars:
•If your bars Move:
(SIDE vIEw)
A friend
would make
this easier .
Q Tower owners:
never reposITIon The Q Towers!
TIghTen your crossbars
If you loosened TheM.
If you have “Q TowerS”
oR bARs ThAT cAnnoT move…
continue to sTeP
.
aTTach faIrIng To eITher end of baSkeT.
Pry open the
SnapArounds,
attach them
to the LOwER
FRONT BAR.
• Insert bolts through
washers, fairing
and Snaparounds.
• attach knobs and TIghTen.
NOTE: The fairing can fold down when
carrying long slender loads.
Remove the machine screws from
the ends of the Loadwarrior tubes.
noTe
: always replace
machine screws
with washers (from
loadWarrior) into same
holes when reassembling.
You may find tapered
screws with your
Extension.
MACHINE
SCREwS
TAPERED
SCREwS
do noT insert the tapered
screws from extension into your
Loadwarrior’s holes.
exTensIon
UseRs:
Insert screws with
washers into each
of the joints and
tighten them.
Assemble
The baSkeT.