en – Original instructions
16
e-IXPS - Installation, Operation and Maintenance Instructions
Installation
1.
Drill the tie rod holes in accordance with the quantity, diameter and centre distances shown
in the technical catalogue.
2.
Insert the tie rods into the holes and secure them with chemical anchors.
3.
Remove the caps of the suction and discharge ports.
4.
Place the unit on the foundation by inserting the tie rods into the holes in the plate.
5.
Level the unit with a spirit level on the shaft and discharge port: the maximum permitted
tolerance is 0.2 mm/m (0.0024 in/ft).
6.
Align the suction and discharge ports to their piping.
7.
If necessary, insert levelling shims between the plate and the foundation.
8.
Tighten the nuts on the tie rods evenly and fully.
Hexagon nut
Torque, Nm (lbf·in)
M12
60 (44)
M16
120 (89)
M20
200 (148)
M24
350 (258)
M27
530 (391)
DANGER: Explosion due to static charge
Ensure that the base plate is earthed correctly.
Reducing vibrations
The motor and the flow of liquid in the piping can generate vibrations, which may be amplified
from the possible incorrect installation of the unit and the piping. See
page 17.
XIPS_M0007_A_sc