![Xylem JABSCO Ballast SuperKing Quick Start Manual Download Page 8](http://html.mh-extra.com/html/xylem/jabsco-ballast-superking/jabsco-ballast-superking_quick-start-manual_892191008.webp)
www.xylem.com/jabsco
© 2022 Xylem Inc. All rights reserved
Jabsco is a trademark of Xylem Inc. or one of its subsidiaries
43010-0333 Rev. A 03/2022
Xylem Inc. — USA
17942 Cowan
Irvine, CA 92614
Xylem Inc. — HUNGARY KFT
2700 Cegléd
Külso-Kátai út 41
Xylem Inc. — UK
Harlow Innovation Park,
London Road, Harlow, Essex, CM17 9LX
Xylem Inc. — AUSTRALIA
2/2 Capicure Drive
Eastern Creek, NSW 2766
Xylem Inc. — CHINA
30/F Tower A, 100 Zunyi Road, Shanghai
200051
Warranty:
XYLEM LIMITED WARRANTY WARRANTS THIS PRODUCT TO BE FREE OF DEFECTS AND WORKMANSHIP FOR A PERIOD OF 1 YEAR. THE WARRANTY IS EXCLUSIVE AND IN
LIEU OF ANY AND ALL OTHER EXPRESS OR IMPLIED WARRANTIES, GUARANTEES, CONDITIONS OR TERMS OF WHATEVER NATURE RELATING TO THE GOODS PROVIDED
HEREUNDER, INCLUDING WITHOUT LIMITATION ANY IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, WHICH ARE HEREBY
EXPRESSLY DISCLAIMED AND EXCLUDED. EXCEPT AS OTHERWISE PROVIDED BY LAW, BUYER’S EXCLUSIVE REMEDY AND SELLER’S AGGREGATE LIABILITY FOR BREACH
OF ANY OF THE FOREGOING WARRANTIES ARE LIMITED TO REPAIRING OR REPLACING THE PRODUCT AND SHALL IN ALL CASES BE LIMITED TO THE AMOUNT PAID BY THE
BUYER HEREUNDER. IN NO EVENT IS SELLER LIABLE FOR ANY OTHER FORM OF DAMAGES, WHETHER DIRECT, INDIRECT, LIQUIDATED, INCIDENTAL, CONSEQUENTIAL,
PUNITIVE, EXEMPLARY OR SPECIAL DAMAGES, INCLUDING BUT NOT LIMITED TO LOSS OF PROFIT, LOSS OF ANTICIPATED SAVINGS OR REVENUE, LOSS OF INCOME, LOSS
OF BUSINESS, LOSS OF PRODUCTION, LOSS OF OPPORTUNITY OR LOSS OF REPUTATION. THIS WARRANTY IS ONLY A REPRESENTATION OF THE COMPLETE LIMITED
WARRANTY. FOR A DETAILED EXPLANATION, PLEASE VISIT US AT
www.xylem.com/en-us/support/
, CALL OUR OFFICE NUMBER LISTED, OR WRITE A LETTER TO YOUR
REGIONAL OFFICE.
AIS (Aquatic Invasive Species) Decontamination Process.
All of our pumps are designed to meet the ABYC standards for the current AIS
Decontamination procedure including low pressure water at 120ºF for 130 seconds.
Please follow current guidelines for the decontamination process.