24V
21
22
9
38
26 25 24 23 22 21 20 19 18 17 16 15 14 13 12 11 10 9 8 7 6 5 4 3 2 1
37 36 35
10 11 12
FOO126A
Ethernet
Ext.1
Local
Power
A
B Go
MAS 711
Monitoring and Status
TD
TD
RD
RD
TD RD
Ext.2
Link LAN
19 7
1
20
18
14
17 16 13 8
5
3
15 4 6
2
Figure 14: Connections at the MAS 711 base unit
This table shows how the conductors are connected to the different sensors.
Sensor
Terminal block Conductor
number for 12-
lead cable
Conductor for
24-lead cable
Float switch in the stator house
1
1
1
1
2
2
2
Float switch in the junction box
9
7
7
2
—
—
Pt100 in the main bearing
2
3
3
3
4
4
4
Pt100 in the support bearing
37
—
17
38
—
18
Thermal switches or thermistors in the stator
5
5
5
6
6
6
CLS sensor in the oil housing
+ 33
—
19
– 34
—
20
1
The leakage sensor in the stator housing and the leakage sensor in the junction box use the same terminal (terminal 2) on the terminal
block.
2
The Pt100 sensors in the main bearing and the support bearing use the same terminal (terminal 4) on the terminal block.
4 Installation
32
P7900 Installation, Operation, and Maintenance Manual
Summary of Contents for FLYFT P7900
Page 1: ...Installation Operation and Maintenance Manual 90028101_1 0 P7900...
Page 2: ......
Page 75: ......