1
2
3
WS008230C
4
5
6
1. PEM communication terminals
2. PEM control terminals
3. Functional ground
4. Cable tie
5. Terminal plate
6. Index arrow. The index arrow on
the terminal plate is aligned with
the cable inlet.
1. Install the monitoring equipment. See the System Installation and Operation (SIO)
Manual for the MAS 801 monitoring equipment.
2. Connect the two signal leads that are integrated in the SUBCAB
®
cable, T1 and T2, to
the MAS BU.
See the chapter “Installation” in the SIO Manual for the MAS 801 monitoring equipment.
3. If they are not already connected, then connect the T1 and T2 leads integrated in the
SUBCAB cable to the PEM. See the illustration and table in
on page 28.
4. If they are not already connected, then connect the power leads:
a) Check the data plate to determine which connection is valid for the voltage supply.
b) Connect the power leads to the terminal board connection U1, U2, V1, V2, W1, W2,
and ground (earth) according to the cable chart.
See
on page 36.
5. Install the entrance flange:
a) Fit the entrance flange parts according to the illustration for the correct drive unit.
5
1
2
3
4
WS006038A
1. Seal sleeve
2. Spacer ring
3. Seal sleeve
4. O-ring
5. Washer
Figure 7: Drive units 705–776
4 Installation
26
P7900 Installation, Operation, and Maintenance Manual