OPERATION
9
INSTALLATION
How to install Cell:
ATTENTION: Before installation, ensure power is disconnected!
Grounding (earth bonding) is required. The unit should be installed by a qualified service person and grounded.
Install to allow access to cell buttons and power center.
Read Safety Precautions and Important Instructions on page 1. Before attempting any electrical
wiring, be sure to read and follow Safety Instructions. Wiring should only be performed by a qualified
professional.
● Install the CFPT unit a minimum of three (3) feet away from the heater outlet.
● Pi
pe couplings: Schedule 80, maximum pressure 75 psi at 70F (21°C).
1.
Using PVC glue, mount the PVC couplings to the plumbing pipe. Allow the glue to dry.
2.
Mount the cell vertically. Allow access to the cell operator control panel. Install the cell onto the couplings.
Ensure the O-rings are seated properly.
3.
Switch on the pump and visually inspect for leaks around the couplings.
Connecting CFPT Cell Cable to the Power Center
WARNING -
Switch OFF main system power to the Power Center before making any connections.
1.
Be sure that AC power is switched OFF before connecting the power cord to the Power Center.
2.
Align the three (3) pins of the cell power cord connector with the socket on the top of the Power
3.
Center and insert the connector. Turn the round socket nut until it locks the connector in place.
The power center is dual voltage 115V-230V, it will auto convert, no additional wiring needed.