7
1.1.3
Precautions during packing
1.1.3.1
Packing material: The base is wood and main part is cardboard box.
1.1.3.2
Packing sequence: Put the wood base on the ground. Then, put the machine on it.
Next, pack the machine with plastic film and put vibration-absorbing board around
the machine. Then, put the cardboard box on the machine. Use nails to fix the
cardboard box and wood base. At last, bind it with pp stripes.
1.2
Precautions before and after machine starting
1.2.1
Precautions before machine starting
1.2.1.1
Before using this machine, read and realize the contents of this manual in detail.
1.2.1.2
Check that whether the voltage is correct.
1.2.1.3
Confirm that whether the electric power and its rating is sufficient
1.2.1.4
Check that whether all the safety related devices are normal, and notice that whether
anyone within the danger zone.
1.2.1.5
Visual check that whether all mechanical and electric parts are normal, and also
notice that whether the surrounding environment is clean.
1.2.1.6
Sequences of power on:
1.2.1.6.1
Turn on the factory power.
1.2.1.6.2
Turn on the main switch of the machine.(31)
1.2.1.6.3
Connect the air to the machine by quick connector.(3-1)
1.2.1.6.4
Connect the connector of the nitrogen container to nitrogen inlet. (4)
1.2.2
Precautions after machine starting
1.2.2.1
Confirm that whether the display is correct.
Summary of Contents for TS420
Page 3: ...2 5 2 Airborne noise level 5 3 Storage condition 5 4 Operation environment ...
Page 5: ...4 Unit mm ...
Page 6: ...5 ...
Page 12: ...11 2 5 4 Warning sign WARNING ...
Page 23: ...22 ...
Page 24: ...23 ...
Page 26: ...25 ...
Page 28: ...27 ...
Page 30: ...29 ...
Page 32: ...31 ...
Page 34: ...33 ...
Page 36: ...35 ...
Page 38: ...37 ...
Page 40: ...39 ...
Page 42: ...41 ...
Page 44: ...43 ...
Page 46: ...45 A B C D E A B C D E CIRCUUIT DIAGRAM DATE NAME PROCESSED CHECKED STANDARD PAGE ...
Page 47: ...46 Q1 PC H1 EStop A B C D E A B C D E DATE NAME PROCESSED CHECKED STANDARD PAGE ...