Xtralis
VESDA
®
Xtralis VESDA VLP Product Guide
www.xtralis.com
29
Note:
If intelligent VESDA power supply is fitted it will report power failures (F15) on
VESDA
net
. VLP & VLS with GPI terminals connected will maintain their aspirator
speed for an hour after the loss of mains power. After which, the aspirator speed will
be limited to 3000 rpm to conserve power.
10 Powering Up
A VLP detector must be powered up by Xtralis VESDA accredited personnel only.
After installing the VLP detector it is necessary to power up the system.
The system takes approximately 15 seconds to power up.
If the system fails to power up, check all power wires are secured to its terminals and the
polarities of the power wires are correctly terminated.
On power up:
•
The aspirator starts up and air is felt flowing out of the exhaust port
•
If a programmer module is fitted, the word “VESDA” will be displayed
•
If a Display Module is fitted, the following indicators are lit:
-
Fire Alarm Threshold indicators
-
Smoke Threshold indicators on bargraph
-
Two digit numerical display
-
Various fault indicators if there are any faults
-
System OK indicator if there are no faults
If any of the above does not happen, contact your commissioning engineer or distributor to
troubleshoot.
Note:
It is normal for the detector to display troubles immediately after power up. Reset
the detector by pressing the reset button on the front cover of the detector to unlatch
the relays and fault LEDs. The LEDs for any remaining faults cover will illuminate.
Proceed with the preliminary systems check.
Summary of Contents for VESDA VLP
Page 1: ...Xtralis VESDA VLP Product Guide August 2008 Document Number 10278_07 Part Number 19145 ...
Page 2: ......
Page 8: ...Xtralis VESDA VLP Product Guide Xtralis VESDA 2 www xtralis com ...
Page 19: ...Xtralis VESDA Xtralis VESDA VLP Product Guide www xtralis com 13 Figure 8 VLP dimensions ...
Page 46: ...Xtralis VESDA VLP Product Guide Xtralis VESDA 40 www xtralis com ...