8
FS3.0 Elliptical
#29
. 1/2” x 70mm
Carriage Bolt (2 pcs)
#30
. 1/2”
Nyloc Nut (2 pcs)
#44
. 5/16” Flat
Washer (2 pcs)
#46
. 5/16”
Split Washer (2 pcs)
#52
. 5 x 12mm
Sheet Metal Screw
(2 pcs)
#53
. M5 x 12mm
Phillips Head
Screw (2 pcs)
#98
. 5/16” x 1”
Button Head Socket
Bolt (2 pcs)
Pedal Arms Assemblies
4
Hardware Step 4
1. Locate the Right side Pedal Arm Assembly (
2
) and install onto the
pedal axles’ large rotating wheel at the rear of the elliptical. Attach with
one Button Head Socket Bolt (
98
), one Split Washer (
46
) and one Flat
Washer (
44
). Use the M5 Allen Wrench (
68
) to tighten.
2. Locate the Carriage Bolt (
29
) and slide it through the bracket at the front
of the Pedal Arm Assembly (
2
) and Lower swing arm (
6
). Fasten a Nyloc
Nut (
30
) to the carriage bolt (
29
) with the 19mm Wrench (
69
).
3. Attach the Pedal Arm Covers (
85
,
86
) onto the Pedal Arm Assembly (
2
)
with one Sheet Metal Screw (
52
). Tighten using the Phillips Head Screw
Driver (
68
).
4. Attach Rear Cover (
125
) onto the Pedal Arm Assembly (
2
) with one Phil-
lips Head Screw (
53
). Tighten with Phillips Head Screw Driver (
68
).
5. Repeat the steps above for the left side pedal arm assembly.