XTCERA X-MILL 300 User Manual Download Page 8

11

12

3-3 MILLING BUR SELECTION AND REPLACEMENT

3-3 BUR SELECTION AND REPLACEMENT

3-4 KEY POINTS FOR CIRCULAR MATERIALS CLAMPING

   Bur replacement, which is very important in daily processing, will directly affect equipment 

safety and quality and thus needs careful operation. Therefore, when burs have been used 

for a period of time or they will affect processing quality, bur replacement operation should 

be executed complying with the following steps:

   1.Firstly, execute the "HOME" operation to ensure that the system has been back to the 

origin.

   2.If the current burs in the spindle do not need to be replaced, click the corresponding

bur buttons in manual mode to let the equipment automatically take out the target burs;

   3.Click the “FIRST REFERENCE” button to move the axes to the reference position.

   4.Loosen the spindle collet by click the collet button in the manual interface and take out 

the burs need to be replaced. Note that the  spindle collet is flexible, so hold the burs with 

your hands before loosening the collet in order to avoid damage when the burs pop up. 

Keep in mind: collaboration is prohibited when operating; every step must also be carefully 

confirmed when operating by a single person. Mal-operation on the spindle should be 

avoided so as not to cause personal injury.

   Any kind of material must be clamped strictly complying with the clamping require-ments, 

in order to avoid badness.

   1. No processing residue should be left in the holder and cleaning after eachclamping 

must be done.

   2. Clamps with badness such as bump caused by collision should not be in continual use.

   5. Insert the new bur into the spindle collet, make sure the lantern ring reached to the

collet and then tighten the collet by click the collet button agian in the manual interface. 

Using lantern ring is to make sure that bur installation depth conforms to the equipment 

processing requirements. So please do not directly put the burs without lantern rings into 

the collet or bur pouch in the bur repository. At this point, bur replacement is completed.

6.The length of bur handle out of the lantern ring is about 20mm. If the ring of bur moves, 

please replace the burs timely; otherwise, there may be risk of crashing and burs fracture.

7. Normally a bur can mill around 180units of crown, when the milling job reach this limits, 

we suggest you to replace the burs timely to avoid any bur breakage and collapse,and bad-

ness caused by this . 

8. Bur body uses a kind of high-hardness and low-toughness material; when suffered from 

external force, it is easy to fracture. So when operating the workpiece loading and cleaning 

the processing chamber, be careful not to touch the cutting edge, so as not to cause frac-

ture and personal injury.

Summary of Contents for X-MILL 300

Page 1: ...X MILL 300 300 Address 2F 1Building Honghualing west Industrial Park 88th zhuguang north road xili Nanshan District ShenZhen Guangdong China Tel 0086 755 8600 1804 Fax 0086 755 8600 1486 E mail xtcer...

Page 2: ...should be operated by professionals If you have any question please do not hesitate to contact us Our professional engineers will try their best to help you Shenzhen Xiangtong Co Ltd Address 2F 1Buil...

Page 3: ...ported high precision lead screw and linear guide rail while the electric parts adopt the latest servo drive system of Panasonic to ensure operation stability and precision This machine is highly flex...

Page 4: ...4 axis engraving and milling machine is mainly composed of engine base linear motion mechanism motor drive system motion control system circuit pneumat ic water control system man machine operating in...

Page 5: ...is forbidden to transport the shell and the movable door when transporting the com plete machine the baseboard of the complete machine should be transported 6 It is forbidden to move the equipment by...

Page 6: ...mally If there is no abnormality then click the button again to stop the spindle 8 Click the FIRST REFERENCE button and the SECOND REFERENCE button suc cessively and observe if the equipment movement...

Page 7: ...al ly select corresponding processing strategies according to the file information Adjust the system parameters and related auxiliary functions and click the START button after con firmation to perfor...

Page 8: ...as not to cause personal injury Any kind of material must be clamped strictly complying with the clamping require ments in order to avoid badness 1 No processing residue should be left in the holder a...

Page 9: ...ure They must be cleaned before clamping to avoid causing clamping badness 4 To ensure that in corresponding position of the bur repository there are special bur for glass ceramic processing and check...

Page 10: ...ality and reduce the lifetime of burs and cooling water pumps 4 2 SPECIAL ANNOUNCEMENT 1 If you purchase equipment of our company using for processing other products than specified materials in this m...

Page 11: ...the shell or it may lead to shell deformation or equipment drop causing serious accident 8 If abnormal sound or movement happens in use please record the abnormal informa tion and contact us 9 Multi t...

Page 12: ...r switch and the system is powered on Waiting for starting completed System starting completed Run software and perform processing operations Equipment using completed Exit the software and close Wind...

Reviews: