3-2 PROCESSING AND RUNNING

   3. Click the “START” button, which will then become “PAUSE”. Start commissioning of 

automatic processing; observe equipment action and interface instructions until the 

processing is completed without abnormality.

   4. Check if size and appearance parameters of the processed test work pieces are 

within the qualified range. If there is no problem, then commissioning is completed and 

normal processing can be started; if there is any problem, then make parameter adjust-

ments based on the actual condition.

   1. After completing the commissioning operation, formal production can be started. The 

operation steps of formal production are basically same as the commissioning operation 

steps.

   2. In manual mode, click the "FIRST REFERENCE" button and the axes will automatically 

return to a position suitable for loading and unloading material plate. Then load the work-

piece into the holder and tighten the screw evenly.

   3. Switch to auto mode and load correct processing files, then the system will automatical-

ly select corresponding processing strategies according to the file information. Adjust the 

system parameters and related auxiliary functions and click the "START" button after con-

firmation to perform automatic processing.

   4. If there is a need to suspend processing during the processing period, then click the 

"PAUSE" button. If there is a need to stop processing, then click the "STOP" button. If there 

is any abnormality in the processing process, the system will automatically interrupt the 

current processing and retain the current line information; users can click the “START” 

button to continue the interrupted processing after eliminating abnormalities.(Do not click 

the “STOP” button; otherwise the processing will start from the beginning again)

   5. If power cut happens during the processing period, restart the software when the 

system is powered on again, and the system will automatically load the previous process-

ing files and recover the interrupted line information that being saved. Users can click the 

"START" button when the system loading is completed, then the processing before power 

failure can be restored. (Do not click the “STOP” button; otherwise the processing will start 

from the beginning again)

Figure 3-1

Summary of Contents for X-MILL 300

Page 1: ...X MILL 300 300 Address 2F 1Building Honghualing west Industrial Park 88th zhuguang north road xili Nanshan District ShenZhen Guangdong China Tel 0086 755 8600 1804 Fax 0086 755 8600 1486 E mail xtcer...

Page 2: ...should be operated by professionals If you have any question please do not hesitate to contact us Our professional engineers will try their best to help you Shenzhen Xiangtong Co Ltd Address 2F 1Buil...

Page 3: ...ported high precision lead screw and linear guide rail while the electric parts adopt the latest servo drive system of Panasonic to ensure operation stability and precision This machine is highly flex...

Page 4: ...4 axis engraving and milling machine is mainly composed of engine base linear motion mechanism motor drive system motion control system circuit pneumat ic water control system man machine operating in...

Page 5: ...is forbidden to transport the shell and the movable door when transporting the com plete machine the baseboard of the complete machine should be transported 6 It is forbidden to move the equipment by...

Page 6: ...mally If there is no abnormality then click the button again to stop the spindle 8 Click the FIRST REFERENCE button and the SECOND REFERENCE button suc cessively and observe if the equipment movement...

Page 7: ...al ly select corresponding processing strategies according to the file information Adjust the system parameters and related auxiliary functions and click the START button after con firmation to perfor...

Page 8: ...as not to cause personal injury Any kind of material must be clamped strictly complying with the clamping require ments in order to avoid badness 1 No processing residue should be left in the holder a...

Page 9: ...ure They must be cleaned before clamping to avoid causing clamping badness 4 To ensure that in corresponding position of the bur repository there are special bur for glass ceramic processing and check...

Page 10: ...ality and reduce the lifetime of burs and cooling water pumps 4 2 SPECIAL ANNOUNCEMENT 1 If you purchase equipment of our company using for processing other products than specified materials in this m...

Page 11: ...the shell or it may lead to shell deformation or equipment drop causing serious accident 8 If abnormal sound or movement happens in use please record the abnormal informa tion and contact us 9 Multi t...

Page 12: ...r switch and the system is powered on Waiting for starting completed System starting completed Run software and perform processing operations Equipment using completed Exit the software and close Wind...

Reviews: