INDEX
USER MANUAL - OPTIMA RT10 6K/10K
www.xmart-ups.com
VER.161205-GA2 (ENG)
35
8.
START-UP
INSPECTION BEFORE START UP
1.
Make sure all wires are tightly connected to terminal block. Any loose connection will produce overheating, failures and damage to
UPS.
2.
Make sure all instructions of installation sections have been performed correctly.
3.
Put the terminal block cover back in its position to avoid access to wiring
4.
Check EPO port:
EPO Port closed (Wired): EPO function disabled
EPO port connected to an emergency switch: EPO function available by activation of Emergency Switch; which must be
“Normally Closed” type in order to guarantee that UP
S will shut down when circuit opens.
5.
Check Maintenance Bypass Switch (MBS) located in UPS rear panel is in UPS position and its safety cover plate is duly installed.
6.
Make sure all external protection devices in input and output lines are in open (OFF) position.
SINGLE UPS - START UP PROCEDURE
1.
Make sure all equipment connected to UPS are off
2.
Power input lines ON at electrical board by setting Circuit Breaker to ON
3.
Put Battery Bank breaker to ON (in case UPS has XBAT connected)
4.
Put AC INPUT Breaker to ON in UPS rear panel.
5.
LCD of UPS must turns on. UPS should adopt bypass mode.
6.
Start up the UPS by pressing <ON> push button during a couple of seconds. ON button must be pressed until LCD shows the text
“ON”. If ON button is released before that, UPS will not
turn-on.
7.
UPS will run an auto-test and few seconds later, UPS leaves By-
Pass mode to enter in Normal Online Mode, also known as “AC
Mode”. ONLINE LED must light in green color.
8.
Switch external output breakers to ON position.
9.
Power on sequentially each protected equipment. The front panel LCD should show the load increase as equipment starts.
10.
Once all equipment are on, the total power consumption (load) should not exceed UPS capacity.
11.
At this moment UPS working under NORMAL AC-MODE and the system is supplied by UPS.
NOTE 1:
If any error or warning message is indicated in LCD, please revise Troubleshooting section of this manual.
NOTE 2:
UPS batteries maybe are not fully charged. UPS could require about 4 to 6 hours to recharge batteries up to 100% of their
capacity.