Wireless Array
Installing the Wireless Array
67
Array LED Operating Sequences
Use the following tables to review the operating sequences of the Array’s LEDs.
“LED Boot Sequence” on page 67
“LED Operation when Array is Running” on page 68
LED Boot Sequence
The normal boot LED sequence is as follows:
Array Activity
Status LED
IAP LEDs
Power ON
Blinking GREEN
All OFF
Boot loader power ON
self-test
Blinking GREEN
All ON
Image load from
compact FLASH
Blinking GREEN
Spinning pattern (rotate all
to ON, then all to OFF)
Image load failure
Blinking ORANGE
All OFF
Hand off to ArrayOS
Solid GREEN
All OFF
System software
initialization
Solid GREEN
Walking pattern — (LED
rotating one position per
second)
Up and running
Solid GREEN
ON for IAPs that are up:
OFF for IAPs that are down.
Green or orange per table on
the next page.
Behavior may be changed
using
“LED Settings” on
page 354
.
Summary of Contents for XR-520
Page 2: ......
Page 102: ...Wireless Array 80 Installing the Wireless Array...
Page 112: ...Wireless Array 90 The Web Management Interface...