3.
after the success of connection, the PLC can be monitored online, and the program can be
downloaded and uploaded remotely.
5. Using steps (XC series/Modbus RTU)
5-1. Prepartion
Open the function of data traffic for the Nano SIM card
Open the message function (optional)
XC2 and up series PLC hardware V3.3 and up
XCPPro programming software V3.3r and up
XINJEConfig tool version v1.6.343 and up
XC series PLC programming cable
PC (enable to visit internet, installed XCPPro software)
5-2. Module configuration
The module configuration needs XCPPro software and Config tool. Please make sure the PLC
hardware and software version meet the requirements in chapter 5-1.
Summary of Contents for 4GBOX
Page 7: ...XD 4GBOX ED...