xenex Light Strike Set-Up & Use Manual Download Page 2

Xenex Disinfection Services LLC- Confidential and Proprietary Information.

12082017 Original Instructions. 730-00009-02

xenex.com   |   866-867-9799   |   page 2 

UNPACK THE POD / SET-UP

LightStrike Disinfection Pod™ Shipping Contents

Your LightStrike Disinfection Pod™ is packaged in a single box, pre-assembled 

and ready to use.

 (Fig: 1)

Unpack LightStrike Disinfection Pod™

1.   Release the bands that secure the shipping box and remove the lid. 

(Figs: 1)

2.    Open the box and remove pod and plastic sleeve.
3.   Set the pod upright on its wheels and remove the cloth storage cover.

Set Up: Initial Extension: 

The pod envelope comes installed in the recommended storage position on the frame.

1.    Remove the black velcro storage belt from the LightStrike™ pod and store it with the cover. 

(Fig:1-A)

2.   Stand with wheels of pod facing you, place hands on corner posts closest to you, lift them slightly off the 

ground and step backwards. Carefully spread open the frame. 

(Fig 1-B) 

3.    Now release two Fig1-B Velcro suspension straps at top of pod and two Velcro straps above the locking 

corners on right side

 (arrows in red, Fig 1-C)

4.    Press center push plate of the lower end truss on floor/ground. It is in place when it snaps flat on the 

ground. Repeat this step on opposite end of the frame. 

(Fig 1-D)

WARNING! CASE IS  

GREATER THAN SEVENTY 

FIVE (75) POUNDS

(Figs: 1)

(Fig: 1A)

(Fig: 1B)

(Fig: 1C)

(Fig: 1D)

Summary of Contents for Light Strike

Page 1: ...Xenex Disinfection Services LLC Confidential and Proprietary Information xenex com 866 867 9799 POD SET UP USE MANUAL...

Page 2: ...ension The pod envelope comes installed in the recommended storage position on the frame 1 Remove the black velcro storage belt from the LightStrike pod and store it with the cover Fig 1 A 2 Stand wit...

Page 3: ...eight of 77 inches 6 ft 5 in 1 96 meters 6 Stand facing either end of the Pod and place one foot on the center push plate of the lower truss in front of you Grip your hands around the corner posts and...

Page 4: ...o adjust pod height 11 Secure the sewn in storage straps out of the way during use Fig 2i K Fig 2G Fig 2i Fig 2H Fig 2K Set Up Integrating the LightStrike Robot 1 Unzip the two zippers of the cargo do...

Page 5: ...e LightStrike Robot and power it on 8 Load the items to be disinfected Close both zippers by pulling each downward to the floor 9 Place the orange safety cone in front of the Pod and remove a safety s...

Page 6: ...the 2 lower truss assemblies at each end will cause frame damage if forced If the frame does not easily start to articulate into the closed position STOP Check each of the 4 corner release points and...

Page 7: ...d finish It also has molded plastic parts The frame weight 39 5 lbs The exterior envelope material is a poly pongee ripstop material The internal material is bonded pure aluminum materialized to the e...

Page 8: ...nex Disinfection Services LLC Confidential and Proprietary Information 12082017 Original Instructions 730 00009 02 xenex com 866 867 9799 QUESTIONS ABOUT XENEX CONTACT US 866 867 9799 SUPPORT XENEX CO...

Reviews: