DO NOT RETURN TO RETAILER YOU PURCHASED AT.
CONTACT XDP FOR PARTS AND SUPPORT AT 1.866.884.0535 or [email protected]
4
ANCHORING
(NOTE:ANCHORS ARE NOT INCLUDED-MUST BE PURCHASED SEPARATELY)
There are different ways of anchoring the equipment, depending on the type of ground on which the
equipment is to be installed. Make sure that all anchors are below ground level to prevent tripping.
You should consult your local contractor to decide the most appropriate way to anchor the equipment
in your location.
The following anchoring options may be considered:
Corkscrew Anchoring (Corkscrew Anchors not included)
If your soil is hard (clay, etc.), the corkscrew method may be suitable.
Be sure that the swing set is located on level ground.
Twist the corkscrew anchor into the ground until only the end with the hook is above the ground
and next to the leg. Insert the hook into the bottom opening of the leg.
Ensure that the hook is secured onto the leg opening.
GROUND ANCHORS ARE NOT INCLUDED WITH THIS FRAME - THEY
MUST BE BOUGHT SEPERATELY. PLEASE CONSULT THE PROPER
INSTRUCTION GUIDE THAT COMES WITH YOUR GROUND ANCHOR
KIT TO ENSURE PROPER INSTALLATION WITH THIS FRAME.
Concrete Anchoring (Materials not included)
● If the swing set is set up on grounds with sandy soil (soft) condition, it must be anchored
with concrete footing (concrete not included)
● Be sure that the swing set is assembled and placed on level ground
● Dig holes around swing leg tube, as shown in drawing in the next page. As you dig deeper,
enlarge the diameter of the hole to fix the cement
● Place 2 inches of brick or gravel underneath the leg, as shown in drawing in the next page
● Use about 45 lbs. of concrete per leg
● Cover the concrete with dirt and protective surface material
● Allow 6-7 days for the concrete to dry properly