SECTION 3
INSTALLATION AND INITIAL TURN-ON
PV-15208 Photovoltaic Inverter
Operation and Maintenance Manual
Copyright 2000, Xantrex Technologies Inc./Trace Technologies Corp.
DOCUMENT: 150919
3-2
All wiring methods shall be in accordance with the National Electrical Code ANSI/
NFPA 70. All power conductors interfacing to the PV-15208 should be sized in
accordance with the National Electric Code ANSI/NFPA 70 and local codes. Large
gauge wire must have a minimum bend radius dependent upon the wire gauge
(refer to the National Electric Code, Article 373-6B). Take care to keep the wire
bundles away from any sharp edges which may damage wire insulation over time.
Trace Technologies recommends using No. 6 AWG, 105 degrees C, minimum,
copper wire for all connections with the PV-15208.
CAUTION
Ventilation Considerations
1. Maintain a minimum 6” clearance above and below the PV-15208 for proper cooling fan operation.
2. Maintain a minimum 1” clearance to the left and right of the PV-15208.
Installation
1. The unit must be mounted at least 3’ off the ground, and 12” above any horizontal surface.
2. Screw two 3/8” x 3-1/2” long lag bolts into existing studs in the wall (16-inch mounting center) at
lower mounting level on PV-15208. Lag bolts should be horizontally level with each other. Leave
a minimum of 1” of bolt protruding from the wall.
3. Place the PV-15208 bottom mounting ears, shown in Figure 3-1 and Figure 3-2 onto installed lag
bolts. (See following page.)
4. Hold the unit against wall and install upper lag bolts (3/8” x 3-1/2”). Tighten bolts firmly.
5. Tighten lower lag bolts while unit is held in place.
6. Install two 1-1/2” liquid tight connectors (included with the PV-15208) where shown in
Figure 3-3. (See following page.)
INSTALLATION INSTRUCTIONS
n
o
i
t
a
n
i
m
r
e
T
G
W
A
e
g
n
a
R
e
r
i
W
)
C
A
(
r
o
t
c
a
t
n
o
C
0
1
#
-
3
#
)
C
D
(
k
c
o
l
B
n
o
i
t
u
b
i
r
t
s
i
D
4
1
#
-
0
/
2
The following table shows acceptable wire gauges to be connected to the PV-15208 AC and DC
inputs.
Wire Gauge Table
Figure 3-1