5
Operation
Chapter 5 begins with a system startup check that you carry out after
installation and configuration to verify that the PROsine is operating
correctly. The chapter also provides information that will guide you
during routine, ongoing operations.
For your convenience, the information is divided into four parts:
•
System Startup Check on page 5–2.
•
Operating Considerations on page 5–3.
•
Operation in Inverter Mode on page 5–5.
•
Operation in Charger Mode on page 5–7.
•
Display Mode Screens on page 5–10.
Summary of Contents for PROsine 2.0
Page 1: ...PROsine 2 0 Inverter Charger User s Manual...
Page 2: ......
Page 3: ...PROsine 2 0 Inverter Charger User s Manual...
Page 8: ...vi...
Page 12: ...x...
Page 18: ...xvi...
Page 20: ...xviii...
Page 68: ...Installation 3 26 445 0089 01 01...
Page 120: ...Series Operation 7 12 445 0089 01 01...
Page 128: ...A 8...
Page 132: ...B 4...
Page 147: ......