Applications
975-0289-01-01
1–9
Combination Applications
Important:
Installations of this kind must be certified/approved as
“code-compliant” to the national and local building and electrical codes.
Installers should have adequate knowledge of national and local code to ensure
the installation passes inspection by the local electric authority.
Figure 1-8
Hardwired Combination Applications
Wind Turbine
(Must be self-regulated)
DC IN
AC OUT
AC IN
AC Distribution
Panel
(Sub-Panel)
Solar Panel(s) and
Charge Controller(s)
Main AC
Distribution
Panel
DC IN
DC Disconnects
(recommended)
Important:
The
combination of loads
cannot exceed 1440 W.
Run-times will depend on
the amp-hour rating of
the batteries.
Example only.
Actual installation may vary.
975-0289-01-01(PowerHub_1800).book Page 9 Friday, January 5, 2007 12:47 PM
Summary of Contents for PowerHub 1800
Page 2: ...975 0289 01 01 PowerHub_1800 book Page 2 Friday January 5 2007 12 47 PM...
Page 18: ...ii 975 0289 01 01 PowerHub_1800 book Page ii Friday January 5 2007 12 47 PM...
Page 28: ...1 10 975 0289 01 01 PowerHub_1800 book Page 10 Friday January 5 2007 12 47 PM...
Page 38: ...2 10 975 0289 01 01 PowerHub_1800 book Page 10 Friday January 5 2007 12 47 PM...
Page 70: ...2 975 0289 01 01 PowerHub_1800 book Page 2 Friday January 5 2007 12 47 PM...
Page 71: ...975 0289 01 01 PowerHub_1800 book Page 3 Friday January 5 2007 12 47 PM...