Installing the Link 1000
11
Installing the Link 1000
Overview of Installation Steps
Complete the installation in this order. Refer to
Figure 2
.
1. Mount the control panel (
page 13
).
2. Mount the shunt, and cable it to the negative battery
terminal. Cable the load side of the shunt to the negative
bus for DC loads (
page 14
).
3. Connect wires to the Link 1000 terminal block (
page 15
).
4. Connect wires from the terminal block to the shunt and to
the battery’s positive terminal (
page 16
).
5. Install the fuses (
page 17
).
6. Connect the phone cable to the control panel and the
inverter/charger (
page 17
).